You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@olingo.apache.org by "mibo (Jira)" <ji...@apache.org> on 2022/02/26 10:24:00 UTC
[jira] [Assigned] (OLINGO-1471) OLINGO-1294 was incomplete
[ https://issues.apache.org/jira/browse/OLINGO-1471?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
mibo reassigned OLINGO-1471:
----------------------------
Assignee: mibo
> OLINGO-1294 was incomplete
> --------------------------
>
> Key: OLINGO-1471
> URL: https://issues.apache.org/jira/browse/OLINGO-1471
> Project: Olingo
> Issue Type: Bug
> Components: odata4-server
> Reporter: Steven Hawkins
> Assignee: mibo
> Priority: Major
> Time Spent: 10m
>
> ODataJsonDeserializer was not updated to the newer data model that allows for multiple interior polygon rings. This means incoming geojson values are still limited to a single ring.
--
This message was sent by Atlassian Jira
(v8.20.1#820001)