You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Gour Saha (JIRA)" <ji...@apache.org> on 2014/11/06 22:39:33 UTC
[jira] [Created] (YARN-2823) NullPointerException in RM HA enabled
3-node cluster
Gour Saha created YARN-2823:
-------------------------------
Summary: NullPointerException in RM HA enabled 3-node cluster
Key: YARN-2823
URL: https://issues.apache.org/jira/browse/YARN-2823
Project: Hadoop YARN
Issue Type: Bug
Reporter: Gour Saha
Branch:
2.6.0
Environment:
A 3-node cluster with RM HA enabled. The HA setup went pretty smooth (used Ambari) and then installed HBase using Slider. After some time the RMs went down and would not come back up anymore. Following is the NPE we see in both the RM logs.
{noformat}
2014-09-16 01:36:28,037 FATAL resourcemanager.ResourceManager (ResourceManager.java:run(612)) - Error in handling event type APP_ATTEMPT_ADDED to the scheduler
java.lang.NullPointerException
at org.apache.hadoop.yarn.server.resourcemanager.scheduler.SchedulerApplicationAttempt.transferStateFromPreviousAttempt(SchedulerApplicationAttempt.java:530)
at org.apache.hadoop.yarn.server.resourcemanager.scheduler.capacity.CapacityScheduler.addApplicationAttempt(CapacityScheduler.java:678)
at org.apache.hadoop.yarn.server.resourcemanager.scheduler.capacity.CapacityScheduler.handle(CapacityScheduler.java:1015)
at org.apache.hadoop.yarn.server.resourcemanager.scheduler.capacity.CapacityScheduler.handle(CapacityScheduler.java:98)
at org.apache.hadoop.yarn.server.resourcemanager.ResourceManager$SchedulerEventDispatcher$EventProcessor.run(ResourceManager.java:603)
at java.lang.Thread.run(Thread.java:744)
2014-09-16 01:36:28,042 INFO resourcemanager.ResourceManager (ResourceManager.java:run(616)) - Exiting, bbye..
{noformat}
All the logs for this 3-node cluster has been uploaded.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)