You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@shiro.apache.org by "Francois Papon (Jira)" <ji...@apache.org> on 2022/01/27 17:31:00 UTC
[jira] [Assigned] (SHIRO-852) Configuration for maven-release-plugin prepationGoal should be changed
[ https://issues.apache.org/jira/browse/SHIRO-852?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Francois Papon reassigned SHIRO-852:
------------------------------------
Assignee: Francois Papon
> Configuration for maven-release-plugin prepationGoal should be changed
> ----------------------------------------------------------------------
>
> Key: SHIRO-852
> URL: https://issues.apache.org/jira/browse/SHIRO-852
> Project: Shiro
> Issue Type: Improvement
> Affects Versions: 2.0.0, 1.9.0
> Reporter: Karl Heinz Marbaise
> Assignee: Francois Papon
> Priority: Minor
> Fix For: 2.0.0, 1.9.0
>
> Time Spent: 20m
> Remaining Estimate: 0h
>
> Currently the configuration for maven-release-plugin is given with this:
> {code:xml}
> <!-- "install" needed because we have interrelated dependencies between the modules and we are releasing them all the same - especially consider shiro-all -->
> <preparationGoals>clean apache-rat:check install</preparationGoals>
> {code}
> The {{apache-rat:check}} should be bound correctly to the life cycle.
--
This message was sent by Atlassian Jira
(v8.20.1#820001)
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@shiro.apache.org
For additional commands, e-mail: issues-help@shiro.apache.org