You are viewing a plain text version of this content. The canonical link for it is here.
Posted to user@jmeter.apache.org by Uwe Gerger <Uw...@bmw.de> on 2003/11/19 09:08:10 UTC
jmeter 1.9.1: Problems with scheduler
Hello,
i have problems using the scheduler in jmeter. When setting the start
time f.e 11/19/2003 08:15:00 and the end time 11/19/2003 09:15:00 jmeter
starts all the threads but als the threads are also stopped at the same
time:
11/19/2003 8:42:45 AM INFO - jmeter.engine: Thread VNR-Report1-1
started
11/19/2003 8:42:45 AM INFO - jmeter.engine: Thread VNR-Report1-1 is
done
In my case I want to start 5 Thread with a ramp period of 150 seconds.
I don't understand why?
Thanks in advance
--
Uwe Gerger _/_/_/ _/ _/ _/ _/
BMW AG, TG-53 IT-Technologie _/ _/ _/_/_/_/ _/ _/
80788 Muenchen _/_/_/ _/ _/ _/ _/ _/ _/
Tel: +49 89 382 35687 _/ _/ _/ _/ _/_/_/_/
Fax: +49 89 382 11942 _/_/_/ _/ _/ _/ _/
mailto:Uwe.Gerger@bmw.de
---------------------------------------------------------------------
To unsubscribe, e-mail: jmeter-user-unsubscribe@jakarta.apache.org
For additional commands, e-mail: jmeter-user-help@jakarta.apache.org