You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hive.apache.org by "Zoltan Haindrich (Jira)" <ji...@apache.org> on 2020/06/10 14:04:00 UTC
[jira] [Assigned] (HIVE-23563) Evaluate options to do an early
abort of the build
[ https://issues.apache.org/jira/browse/HIVE-23563?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Zoltan Haindrich reassigned HIVE-23563:
---------------------------------------
Assignee: Zoltan Haindrich
> Evaluate options to do an early abort of the build
> --------------------------------------------------
>
> Key: HIVE-23563
> URL: https://issues.apache.org/jira/browse/HIVE-23563
> Project: Hive
> Issue Type: Sub-task
> Components: Build Infrastructure
> Reporter: Zoltan Haindrich
> Assignee: Zoltan Haindrich
> Priority: Major
>
> if the job is waiting for a long to acquire the lock for a long time; it would be favourable to do a quick check after lock acqusition wether there are new triggers
> https://github.com/apache/hive/pull/948#discussion_r432093713
--
This message was sent by Atlassian Jira
(v8.3.4#803005)