You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Francesco Mari (JIRA)" <ji...@apache.org> on 2015/09/30 09:57:04 UTC
[jira] [Created] (OAK-3461) Run m-bundle-p:baseline before
integration tests
Francesco Mari created OAK-3461:
-----------------------------------
Summary: Run m-bundle-p:baseline before integration tests
Key: OAK-3461
URL: https://issues.apache.org/jira/browse/OAK-3461
Project: Jackrabbit Oak
Issue Type: Improvement
Components: parent
Reporter: Francesco Mari
Assignee: Francesco Mari
The baseline goal of the maven-bundle-plugin is currently bound to the verify phase (as per default). It should be bound to the pre-integration-test phase to give it a possibility to fail before integration tests are executed.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)