You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@openoffice.apache.org by bu...@apache.org on 2016/05/07 07:36:28 UTC
[Issue 126957] New: entry of a date like 1/2/16 appears in cell as a
half
https://bz.apache.org/ooo/show_bug.cgi?id=126957
Issue ID: 126957
Issue Type: DEFECT
Summary: entry of a date like 1/2/16 appears in cell as a half
Product: Calc
Version: 4.0.0
Hardware: All
OS: All
Status: UNCONFIRMED
Severity: Minor
Priority: P5 (lowest)
Component: editing
Assignee: issues@openoffice.apache.org
Reporter: t.sedgman@aapt.net.au
Created attachment 85529
--> https://bz.apache.org/ooo/attachment.cgi?id=85529&action=edit
shows some input of date and the result whether cell was formatted initially or
not
The same thing used to happen with 1/3 where it displays as a third
ie any date starting with what could logically be considered a fraction is
entered as a fraction
If i re enter date using words eg 1 feb 16 it accepts as a correct date
Not serious but it has happened in every version over a number of years and I
have been waiting for someone else to report the bug so it can be squashed
--
You are receiving this mail because:
You are the assignee for the issue.
[Issue 126957] entry of a date like 1/2/16 appears in cell as a half
Posted by bu...@apache.org.
https://bz.apache.org/ooo/show_bug.cgi?id=126957
Marcus <ma...@apache.org> changed:
What |Removed |Added
----------------------------------------------------------------------------
Status|RESOLVED |CLOSED
--
You are receiving this mail because:
You are the assignee for the issue.
[Issue 126957] entry of a date like 1/2/16 appears in cell as a half
Posted by bu...@apache.org.
https://bz.apache.org/ooo/show_bug.cgi?id=126957
oooforum (fr) <oo...@free.fr> changed:
What |Removed |Added
----------------------------------------------------------------------------
CC| |oooforum@free.fr
Status|UNCONFIRMED |RESOLVED
Resolution|--- |DUPLICATE
--- Comment #1 from oooforum (fr) <oo...@free.fr> ---
Already reported
*** This issue has been marked as a duplicate of issue 116771 ***
--
You are receiving this mail because:
You are the assignee for the issue.
[Issue 126957] entry of a date like 1/2/16 appears in cell as a half
Posted by bu...@apache.org.
https://bz.apache.org/ooo/show_bug.cgi?id=126957
Thomas <t....@aapt.net.au> changed:
What |Removed |Added
----------------------------------------------------------------------------
CC| |t.sedgman@aapt.net.au
Latest|--- |4.1.2
Confirmation in| |
--
You are receiving this mail because:
You are the assignee for the issue.