You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hive.apache.org by "Miklos Gergely (Jira)" <ji...@apache.org> on 2020/04/14 18:36:00 UTC

[jira] [Updated] (HIVE-23204) Dummy jira for modifying ptest configuration - after the actual patch

     [ https://issues.apache.org/jira/browse/HIVE-23204?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Miklos Gergely updated HIVE-23204:
----------------------------------
    Description: 
If the ptest configuration is required to be modified, then the server must be restarted, which causes the actually processed patch to fail. In order not to cause trouble to others, the pair of this dummy Jira can be used by queueing this first, then the actual modification, finally this Jira.

When the patch for the other one ([https://issues.apache.org/jira/browse/HIVE-23203]) is is processed, the ptest configuration can be modified, and the server can be restarted, thus the other dummy jira's patch processing will fail. Then the actual modification comes, which will result in some way or the other. Then this dummy Jira comes, and the ptest modifications can be reverted, and the server can be restarted again.

  was:
If the ptest configuration is required to be modified, then the server must be restarted, which causes the actually processed patch to fail. In order not to cause trouble to others, this dummy Jira can be used by queueing this first, then the actual modification, finally the pair of this Jira.

When the patch for this one is is processed, the ptest configuration can be modified, and the server can be restarted, thus this dummy jira's patch processing will fail. Then the actual modification comes, which will result in some way or the other. Then the other dummy Jira comes, and the ptest modifications can be reverted, and the server can be restarted again.


> Dummy jira for modifying ptest configuration - after the actual patch
> ---------------------------------------------------------------------
>
>                 Key: HIVE-23204
>                 URL: https://issues.apache.org/jira/browse/HIVE-23204
>             Project: Hive
>          Issue Type: Test
>          Components: Hive
>            Reporter: Miklos Gergely
>            Priority: Major
>
> If the ptest configuration is required to be modified, then the server must be restarted, which causes the actually processed patch to fail. In order not to cause trouble to others, the pair of this dummy Jira can be used by queueing this first, then the actual modification, finally this Jira.
> When the patch for the other one ([https://issues.apache.org/jira/browse/HIVE-23203]) is is processed, the ptest configuration can be modified, and the server can be restarted, thus the other dummy jira's patch processing will fail. Then the actual modification comes, which will result in some way or the other. Then this dummy Jira comes, and the ptest modifications can be reverted, and the server can be restarted again.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)