You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@maven.apache.org by "Guillaume Nodet (Jira)" <ji...@apache.org> on 2025/03/27 15:21:00 UTC

[jira] [Assigned] (MNG-8556) Add a new "assemble" phase to the default life-cycle

     [ https://issues.apache.org/jira/browse/MNG-8556?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Guillaume Nodet reassigned MNG-8556:
------------------------------------

    Assignee: Guillaume Nodet

> Add a new "assemble" phase to the default life-cycle
> ----------------------------------------------------
>
>                 Key: MNG-8556
>                 URL: https://issues.apache.org/jira/browse/MNG-8556
>             Project: Maven
>          Issue Type: Improvement
>            Reporter: Christoph Läubrich
>            Assignee: Guillaume Nodet
>            Priority: Major
>
> I often encounter the case that I want to do something after "package" is done, e.g build a zip with the jar+all dependencies.
> This is currently already possible, but requires some care (especially when the pom / parent is modified later) to make sure the mojo is executed at the right time.
> I therefore thing it would be very useful to have a {{post-package}} similar to {{prepare-package}} , using {{pre-integration-test}} is possible but has the drawback that it looks semantically wrong and is only executed when I do a mvn verify (in contrast to mvn package).



--
This message was sent by Atlassian Jira
(v8.20.10#820010)