You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Vladimir Rodionov (JIRA)" <ji...@apache.org> on 2017/01/25 23:05:26 UTC

[jira] [Comment Edited] (HBASE-14123) HBase Backup/Restore Phase 2

    [ https://issues.apache.org/jira/browse/HBASE-14123?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15838765#comment-15838765 ] 

Vladimir Rodionov edited comment on HBASE-14123 at 1/25/17 11:05 PM:
---------------------------------------------------------------------

v50 contains the most recent RB changes.

cc: [~enis], [~tedyu], [~saint.ack@gmail.com]


was (Author: vrodionov):
v50 contains the most recent RB changes.

> HBase Backup/Restore Phase 2
> ----------------------------
>
>                 Key: HBASE-14123
>                 URL: https://issues.apache.org/jira/browse/HBASE-14123
>             Project: HBase
>          Issue Type: Umbrella
>            Reporter: Vladimir Rodionov
>            Assignee: Vladimir Rodionov
>            Priority: Blocker
>             Fix For: 2.0.0
>
>         Attachments: 14123-master.v14.txt, 14123-master.v15.txt, 14123-master.v16.txt, 14123-master.v17.txt, 14123-master.v18.txt, 14123-master.v19.txt, 14123-master.v20.txt, 14123-master.v21.txt, 14123-master.v24.txt, 14123-master.v25.txt, 14123-master.v27.txt, 14123-master.v28.txt, 14123-master.v29.full.txt, 14123-master.v2.txt, 14123-master.v30.txt, 14123-master.v31.txt, 14123-master.v32.txt, 14123-master.v33.txt, 14123-master.v34.txt, 14123-master.v35.txt, 14123-master.v36.txt, 14123-master.v37.txt, 14123-master.v38.txt, 14123.master.v39.patch, 14123-master.v3.txt, 14123.master.v40.patch, 14123.master.v41.patch, 14123.master.v42.patch, 14123.master.v44.patch, 14123.master.v45.patch, 14123.master.v46.patch, 14123.master.v48.patch, 14123.master.v49.patch, 14123.master.v50.patch, 14123-master.v5.txt, 14123-master.v6.txt, 14123-master.v7.txt, 14123-master.v8.txt, 14123-master.v9.txt, 14123-v14.txt, HBASE-14123-for-7912-v1.patch, HBASE-14123-for-7912-v6.patch, HBASE-14123-v10.patch, HBASE-14123-v11.patch, HBASE-14123-v12.patch, HBASE-14123-v13.patch, HBASE-14123-v15.patch, HBASE-14123-v16.patch, HBASE-14123-v1.patch, HBASE-14123-v2.patch, HBASE-14123-v3.patch, HBASE-14123-v4.patch, HBASE-14123-v5.patch, HBASE-14123-v6.patch, HBASE-14123-v7.patch, HBASE-14123-v9.patch
>
>
> Phase 2 umbrella JIRA. See HBASE-7912 for design document and description. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)