You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Paul Lin (Jira)" <ji...@apache.org> on 2023/05/22 03:58:00 UTC
[jira] [Created] (FLINK-32143) Automatic cleanup of terminated flinkdeployments
Paul Lin created FLINK-32143:
--------------------------------
Summary: Automatic cleanup of terminated flinkdeployments
Key: FLINK-32143
URL: https://issues.apache.org/jira/browse/FLINK-32143
Project: Flink
Issue Type: New Feature
Components: Kubernetes Operator
Reporter: Paul Lin
Currently, if a job turns into terminated status (e.g. FINISHED or FAILED), the flinkdeployment remains until a manual cleanup is performed.
We could add a configuration named `kubernetes.operator.deployment.cleanup.delay`, and clean up terminated deployments after the delay. The delay is default to `-1` which means the cleanup is disabled.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)