You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@beam.apache.org by "Benjamin Gonzalez (Jira)" <ji...@apache.org> on 2021/05/21 18:27:00 UTC

[jira] [Comment Edited] (BEAM-12387) beam_PostCommit_Python* timing out

    [ https://issues.apache.org/jira/browse/BEAM-12387?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17349419#comment-17349419 ] 

Benjamin Gonzalez edited comment on BEAM-12387 at 5/21/21, 6:26 PM:
--------------------------------------------------------------------

The PR 14788 does not touch anything related to PostCommit_Python or dataflow_exercise_metrics_pipeline_test.ExerciseMetricsPipelineTest.test_metrics_fnapi_it, those are still running with nosetest https://ci-beam.apache.org/job/beam_PostCommit_Python36/3914/testReport/junit/apache_beam.runners.dataflow.dataflow_exercise_metrics_pipeline_test/ExerciseMetricsPipelineTest/test_metrics_fnapi_it/

It is a strange error because other Integration tests as [https://ci-beam.apache.org/job/beam_PostCommit_Py_ValCont/lastCompletedBuild/] failed in the same way, with two successful runs after PR 14788 was merged. 


was (Author: benglez):
The PR 14788 does not touch anything related to PostCommit_Python or dataflow_exercise_metrics_pipeline_test.ExerciseMetricsPipelineTest.test_metrics_fnapi_it, those are still running with nosetest [https://ci-beam.apache.org/job/beam_PostCommit_Python36/3914/testReport/junit/apache_beam.runners.dataflow.dataflow_exercise_metrics_pipeline_test/ExerciseMetricsPipelineTest/test_metrics_fnapi_it/|https://ci-beam.apache.org/job/beam_PostCommit_Python36/3914/testReport/junit/apache_beam.runners.dataflow.dataflow_exercise_metrics_pipeline_test/ExerciseMetricsPipelineTest/test_metrics_fnapi_it/,]

It is a strange error because other Integration tests as [https://ci-beam.apache.org/job/beam_PostCommit_Py_ValCont/lastCompletedBuild/] failed in the same way, with two successful runs after PR 14788 was merged. 

> beam_PostCommit_Python* timing out
> ----------------------------------
>
>                 Key: BEAM-12387
>                 URL: https://issues.apache.org/jira/browse/BEAM-12387
>             Project: Beam
>          Issue Type: Bug
>          Components: test-failures
>            Reporter: Kyle Weaver
>            Assignee: Benjamin Gonzalez
>            Priority: P1
>
> e.g. [https://ci-beam.apache.org/job/beam_PostCommit_Python36/3914/]
> Also includes some metric test failures, see BEAM-12386
> Possibly related to [https://github.com/apache/beam/pull/14788?] cc [~udim]



--
This message was sent by Atlassian Jira
(v8.3.4#803005)