You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@impala.apache.org by "Zoltán Borók-Nagy (Jira)" <ji...@apache.org> on 2026/05/21 11:11:00 UTC

[jira] [Created] (IMPALA-15032) Load Deletion Vectors in parallel in IcebergDeleteBuilder

Zoltán Borók-Nagy created IMPALA-15032:
------------------------------------------

             Summary: Load Deletion Vectors in parallel in IcebergDeleteBuilder
                 Key: IMPALA-15032
                 URL: https://issues.apache.org/jira/browse/IMPALA-15032
             Project: IMPALA
          Issue Type: Improvement
            Reporter: Zoltán Borók-Nagy


IcebergDeleteBuilder loads Deletion Vectors sequentially during Prepare(), in a single thread.

Doing so it can block scan operators. We could use MT_DOP threads to load the DVs, or we could have a dynamic-sized thread pool with number of blocked workers (the builder doesn't necessarily block workers as they might scan data files without deletes).



--
This message was sent by Atlassian Jira
(v8.20.10#820010)