You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Alex Parvulescu (JIRA)" <ji...@apache.org> on 2013/11/08 09:35:18 UTC
[jira] [Created] (OAK-1155) PropertyIndex cost calculation is
faulty
Alex Parvulescu created OAK-1155:
------------------------------------
Summary: PropertyIndex cost calculation is faulty
Key: OAK-1155
URL: https://issues.apache.org/jira/browse/OAK-1155
Project: Jackrabbit Oak
Issue Type: Bug
Components: core, query
Reporter: Alex Parvulescu
The cost calculation can easily go out of bounds when it needs to estimate (whenever there are more than 100 nodes).
The high value it returns can be higher than the traversal index which has a max of 10M, but can be less smaller.
For example:
100 nodes in the index:
with a single level /content cost is 6250000
adding a second level /content/data cost jumps to 1.544804416E9
101 nodes in the index:
with a single level /content cost is 100
adding a second level /content/data stays at 100
100 nodes, 12 levels deep, cost is 2.147483647E9
101 nodes, 12 levels deep, cost is 6.7108864E7
--
This message was sent by Atlassian JIRA
(v6.1#6144)