You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Arvid Heise (Jira)" <ji...@apache.org> on 2020/10/08 06:32:00 UTC
[jira] [Created] (FLINK-19533) Add state assignment to channel
state during rescaling
Arvid Heise created FLINK-19533:
-----------------------------------
Summary: Add state assignment to channel state during rescaling
Key: FLINK-19533
URL: https://issues.apache.org/jira/browse/FLINK-19533
Project: Flink
Issue Type: Sub-task
Components: Runtime / Checkpointing
Affects Versions: 1.12.0
Reporter: Arvid Heise
Assignee: Arvid Heise
Enhance StateAssignmentOperation to create a channel state mapping during rescaling, where channels before rescaling are mapped to channels after rescaling.
Example:
Before rescaling: parallelism of 2, channel 0 = key group range [0,64), channel 1 = key group range [64,128)
After rescaling: parallelism of 3, channel 0 = key group range [0,43), channel 1 = key group range [43,86), channel 2 = key group range [86,128)
Mapping: 0 -> [0, 1], 1 -> [1, 2]
The mapping is passed to the respective channels through deployment descriptors. It will be used in a separate ticket to restore the correct buffers from pre-rescaling channels to post-rescaling channels.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)