You are viewing a plain text version of this content. The canonical link for it is here.
Posted to common-dev@hadoop.apache.org by "Amar Kamat (JIRA)" <ji...@apache.org> on 2008/09/19 16:06:44 UTC

[jira] Assigned: (HADOOP-4220) Job Restart tests take 10 minutes, can time out very easily

     [ https://issues.apache.org/jira/browse/HADOOP-4220?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Amar Kamat reassigned HADOOP-4220:
----------------------------------

    Assignee: Amar Kamat

> Job Restart tests take 10 minutes, can time out very easily
> -----------------------------------------------------------
>
>                 Key: HADOOP-4220
>                 URL: https://issues.apache.org/jira/browse/HADOOP-4220
>             Project: Hadoop Core
>          Issue Type: Bug
>          Components: test
>    Affects Versions: 0.19.0
>            Reporter: Steve Loughran
>            Assignee: Amar Kamat
>
> HADOOP-3245 added job restart and tests for it, but the tests take a long time
> TestJobTrackerRestart	667.682	
> TestJobTrackerRestartWithLostTracker	322.223
> Something needs to be done to speed them up to keep the test cycle viable.

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.