You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Matthias (Jira)" <ji...@apache.org> on 2020/12/28 13:08:00 UTC
[jira] [Assigned] (FLINK-20589) Remove old scheduling strategies
[ https://issues.apache.org/jira/browse/FLINK-20589?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Matthias reassigned FLINK-20589:
--------------------------------
Assignee: Matthias
> Remove old scheduling strategies
> --------------------------------
>
> Key: FLINK-20589
> URL: https://issues.apache.org/jira/browse/FLINK-20589
> Project: Flink
> Issue Type: Task
> Components: Runtime / Coordination
> Affects Versions: 1.13.0
> Reporter: Till Rohrmann
> Assignee: Matthias
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.13.0
>
>
> After the implementation of the pipelined region scheduler (FLINK-16430), we no longer need the old {{LazyFromSourcesSchedulingStrategy}} and {{EagerSchedulingStrategy}} strategies and the components required by it. In order to simplify the maintenance, I suggest to remove these components.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)