continuum scheduled "forced" build

Hi,

Is there a way to force Continuum to build a project even if there are no
changes in the source repository ?
What I try to achieve is to have Continuum build a snapshot using a
different profile every night, even if there were no changes. I have two
schedules attached to the project :

- The default one which runs every hour
- A second one that runs at 1 AM every night.

Now the problem is that, when I commit changes, let's say at 7:35 PM, the
scheduled build at 8 pm will detect these changes and perform a build.
At 1 AM, a cvs update is run, but no changes are detected since there
weren't any new commits since 7:35 PM...

I'd like to have this specific build, build a snapshot and deploy it on our
private repository, so that we always have a latest snapshot deployed every
day (and an up to date doc).
To be able to achieve this, the second schedule should start a "forced"
build...(using a argument ? )

A workaround would be to have the project twice in continuum, one copy with
the default schedule and one copy with the second schedule, but i'd prefere
to avoid this overhead...It still has an advantage though : if no changes
were made at all one day, then there wouldn't be an unnecessary deployment
the next night.

Do you see how I can do that ? Or any better suggestion ?


Thanks for your help

--
Matthew Vanbiervliet
Accelior Consulting
http://www.accelior.com

Re: continuum scheduled "forced" build

Posted by Emmanuel Venisse <em...@venisse.net>.
It will be possible only in 1.1 but not in 1.0.3, sorry.

Emmanuel

Tomislav Stojcevich a écrit :
> Will there be a way to force the build even though there were no scm changes?
> 
> I have projects that generate code from database metadata.  If a
> database change occurs I would need the forced build (scheduled
> nightly) to still occur so that database changes are pick up and the
> system is rebuilt.  Currently, this is not possible without a manual
> forced build.
> 
> On 2/23/06, Emmanuel Venisse <em...@venisse.net> wrote:
> 
>>nothing to do.
>>
>>In 1.0.2, we checked modifications in scm between the current execution and the previous even if it
>>was two different build definition.
>>In 1.0.3, we check scm changes between two executions of the same build definition, so if you set an
>>hourly build schedule and a nightly build schedule, for the nigthly, we check if you have some
>>changes in last 24 hours.
>>
>>Emmanuel
>>
>>Matthew Vanbiervliet a écrit :
>>
>>>Ok thank you.
>>>And how will we be able to activate it ? Will it be a new option to check ?
>>>A new argument ?
>>>
>>>
>>>On 2/22/06, Emmanuel Venisse <em...@venisse.net> wrote:
>>>
>>>
>>>>I fixed this problem in svn but i need to do some more tests before the
>>>>release of Continuum 1.0.3
>>>>
>>>>Emmanuel
>>>>
>>>>Matthew Vanbiervliet a écrit :
>>>>
>>>>
>>>>>I've just seen that there was an open issue about this...
>>>>>Anyway, your suggestions are welcome :-)
>>>>>
>>>>>
>>>>>
>>>>>On 2/22/06, Matthew Vanbiervliet <mv...@gmail.com> wrote:
>>>>>
>>>>>
>>>>>
>>>>>>Hi,
>>>>>>
>>>>>>Is there a way to force Continuum to build a project even if there are
>>>>
>>>>no
>>>>
>>>>
>>>>>>changes in the source repository ?
>>>>>>What I try to achieve is to have Continuum build a snapshot using a
>>>>>>different profile every night, even if there were no changes. I have two
>>>>>>schedules attached to the project :
>>>>>>
>>>>>>- The default one which runs every hour
>>>>>>- A second one that runs at 1 AM every night.
>>>>>>
>>>>>>Now the problem is that, when I commit changes, let's say at 7:35 PM,
>>>>
>>>>the
>>>>
>>>>
>>>>>>scheduled build at 8 pm will detect these changes and perform a build.
>>>>>>At 1 AM, a cvs update is run, but no changes are detected since there
>>>>>>weren't any new commits since 7:35 PM...
>>>>>>
>>>>>>I'd like to have this specific build, build a snapshot and deploy it on
>>>>>>our private repository, so that we always have a latest snapshot
>>>>
>>>>deployed
>>>>
>>>>
>>>>>>every day (and an up to date doc).
>>>>>>To be able to achieve this, the second schedule should start a "forced"
>>>>>>build...(using a argument ? )
>>>>>>
>>>>>>A workaround would be to have the project twice in continuum, one copy
>>>>>>with the default schedule and one copy with the second schedule, but i'd
>>>>>>prefere to avoid this overhead...It still has an advantage though : if
>>>>
>>>>no
>>>>
>>>>
>>>>>>changes were made at all one day, then there wouldn't be an unnecessary
>>>>>>deployment the next night.
>>>>>>
>>>>>>Do you see how I can do that ? Or any better suggestion ?
>>>>>>
>>>>>>
>>>>>>Thanks for your help
>>>>>>
>>>>>>--
>>>>>>Matthew Vanbiervliet
>>>>>>Accelior Consulting
>>>>>>http://www.accelior.com
>>>>>>
>>>>>
>>>>>
>>>>>
>>>>>
>>>>>--
>>>>>Matthew Vanbiervliet
>>>>>Accelior Consulting
>>>>>http://www.accelior.com
>>>>>
>>>>
>>>>
>>>
>>>--
>>>Matthew Vanbiervliet
>>>Accelior Consulting
>>>http://www.accelior.com
>>>
>>
>>
> 
> 
> --
> tom
> 
> 
> 


Re: continuum scheduled "forced" build

Posted by Tomislav Stojcevich <st...@gmail.com>.
Will there be a way to force the build even though there were no scm changes?

I have projects that generate code from database metadata.  If a
database change occurs I would need the forced build (scheduled
nightly) to still occur so that database changes are pick up and the
system is rebuilt.  Currently, this is not possible without a manual
forced build.

On 2/23/06, Emmanuel Venisse <em...@venisse.net> wrote:
> nothing to do.
>
> In 1.0.2, we checked modifications in scm between the current execution and the previous even if it
> was two different build definition.
> In 1.0.3, we check scm changes between two executions of the same build definition, so if you set an
> hourly build schedule and a nightly build schedule, for the nigthly, we check if you have some
> changes in last 24 hours.
>
> Emmanuel
>
> Matthew Vanbiervliet a écrit :
> > Ok thank you.
> > And how will we be able to activate it ? Will it be a new option to check ?
> > A new argument ?
> >
> >
> > On 2/22/06, Emmanuel Venisse <em...@venisse.net> wrote:
> >
> >>I fixed this problem in svn but i need to do some more tests before the
> >>release of Continuum 1.0.3
> >>
> >>Emmanuel
> >>
> >>Matthew Vanbiervliet a écrit :
> >>
> >>>I've just seen that there was an open issue about this...
> >>>Anyway, your suggestions are welcome :-)
> >>>
> >>>
> >>>
> >>>On 2/22/06, Matthew Vanbiervliet <mv...@gmail.com> wrote:
> >>>
> >>>
> >>>>Hi,
> >>>>
> >>>>Is there a way to force Continuum to build a project even if there are
> >>
> >>no
> >>
> >>>>changes in the source repository ?
> >>>>What I try to achieve is to have Continuum build a snapshot using a
> >>>>different profile every night, even if there were no changes. I have two
> >>>>schedules attached to the project :
> >>>>
> >>>>- The default one which runs every hour
> >>>>- A second one that runs at 1 AM every night.
> >>>>
> >>>>Now the problem is that, when I commit changes, let's say at 7:35 PM,
> >>
> >>the
> >>
> >>>>scheduled build at 8 pm will detect these changes and perform a build.
> >>>>At 1 AM, a cvs update is run, but no changes are detected since there
> >>>>weren't any new commits since 7:35 PM...
> >>>>
> >>>>I'd like to have this specific build, build a snapshot and deploy it on
> >>>>our private repository, so that we always have a latest snapshot
> >>
> >>deployed
> >>
> >>>>every day (and an up to date doc).
> >>>>To be able to achieve this, the second schedule should start a "forced"
> >>>>build...(using a argument ? )
> >>>>
> >>>>A workaround would be to have the project twice in continuum, one copy
> >>>>with the default schedule and one copy with the second schedule, but i'd
> >>>>prefere to avoid this overhead...It still has an advantage though : if
> >>
> >>no
> >>
> >>>>changes were made at all one day, then there wouldn't be an unnecessary
> >>>>deployment the next night.
> >>>>
> >>>>Do you see how I can do that ? Or any better suggestion ?
> >>>>
> >>>>
> >>>>Thanks for your help
> >>>>
> >>>>--
> >>>>Matthew Vanbiervliet
> >>>>Accelior Consulting
> >>>>http://www.accelior.com
> >>>>
> >>>
> >>>
> >>>
> >>>
> >>>--
> >>>Matthew Vanbiervliet
> >>>Accelior Consulting
> >>>http://www.accelior.com
> >>>
> >>
> >>
> >
> >
> > --
> > Matthew Vanbiervliet
> > Accelior Consulting
> > http://www.accelior.com
> >
>
>


--
tom

Re: continuum scheduled "forced" build

Posted by Emmanuel Venisse <em...@venisse.net>.
nothing to do.

In 1.0.2, we checked modifications in scm between the current execution and the previous even if it 
was two different build definition.
In 1.0.3, we check scm changes between two executions of the same build definition, so if you set an 
hourly build schedule and a nightly build schedule, for the nigthly, we check if you have some 
changes in last 24 hours.

Emmanuel

Matthew Vanbiervliet a écrit :
> Ok thank you.
> And how will we be able to activate it ? Will it be a new option to check ?
> A new argument ?
> 
> 
> On 2/22/06, Emmanuel Venisse <em...@venisse.net> wrote:
> 
>>I fixed this problem in svn but i need to do some more tests before the
>>release of Continuum 1.0.3
>>
>>Emmanuel
>>
>>Matthew Vanbiervliet a écrit :
>>
>>>I've just seen that there was an open issue about this...
>>>Anyway, your suggestions are welcome :-)
>>>
>>>
>>>
>>>On 2/22/06, Matthew Vanbiervliet <mv...@gmail.com> wrote:
>>>
>>>
>>>>Hi,
>>>>
>>>>Is there a way to force Continuum to build a project even if there are
>>
>>no
>>
>>>>changes in the source repository ?
>>>>What I try to achieve is to have Continuum build a snapshot using a
>>>>different profile every night, even if there were no changes. I have two
>>>>schedules attached to the project :
>>>>
>>>>- The default one which runs every hour
>>>>- A second one that runs at 1 AM every night.
>>>>
>>>>Now the problem is that, when I commit changes, let's say at 7:35 PM,
>>
>>the
>>
>>>>scheduled build at 8 pm will detect these changes and perform a build.
>>>>At 1 AM, a cvs update is run, but no changes are detected since there
>>>>weren't any new commits since 7:35 PM...
>>>>
>>>>I'd like to have this specific build, build a snapshot and deploy it on
>>>>our private repository, so that we always have a latest snapshot
>>
>>deployed
>>
>>>>every day (and an up to date doc).
>>>>To be able to achieve this, the second schedule should start a "forced"
>>>>build...(using a argument ? )
>>>>
>>>>A workaround would be to have the project twice in continuum, one copy
>>>>with the default schedule and one copy with the second schedule, but i'd
>>>>prefere to avoid this overhead...It still has an advantage though : if
>>
>>no
>>
>>>>changes were made at all one day, then there wouldn't be an unnecessary
>>>>deployment the next night.
>>>>
>>>>Do you see how I can do that ? Or any better suggestion ?
>>>>
>>>>
>>>>Thanks for your help
>>>>
>>>>--
>>>>Matthew Vanbiervliet
>>>>Accelior Consulting
>>>>http://www.accelior.com
>>>>
>>>
>>>
>>>
>>>
>>>--
>>>Matthew Vanbiervliet
>>>Accelior Consulting
>>>http://www.accelior.com
>>>
>>
>>
> 
> 
> --
> Matthew Vanbiervliet
> Accelior Consulting
> http://www.accelior.com
> 


Re: continuum scheduled "forced" build

Posted by Matthew Vanbiervliet <mv...@gmail.com>.
Ok thank you.
And how will we be able to activate it ? Will it be a new option to check ?
A new argument ?


On 2/22/06, Emmanuel Venisse <em...@venisse.net> wrote:
>
> I fixed this problem in svn but i need to do some more tests before the
> release of Continuum 1.0.3
>
> Emmanuel
>
> Matthew Vanbiervliet a écrit :
> > I've just seen that there was an open issue about this...
> > Anyway, your suggestions are welcome :-)
> >
> >
> >
> > On 2/22/06, Matthew Vanbiervliet <mv...@gmail.com> wrote:
> >
> >>Hi,
> >>
> >>Is there a way to force Continuum to build a project even if there are
> no
> >>changes in the source repository ?
> >>What I try to achieve is to have Continuum build a snapshot using a
> >>different profile every night, even if there were no changes. I have two
> >>schedules attached to the project :
> >>
> >>- The default one which runs every hour
> >>- A second one that runs at 1 AM every night.
> >>
> >>Now the problem is that, when I commit changes, let's say at 7:35 PM,
> the
> >>scheduled build at 8 pm will detect these changes and perform a build.
> >>At 1 AM, a cvs update is run, but no changes are detected since there
> >>weren't any new commits since 7:35 PM...
> >>
> >>I'd like to have this specific build, build a snapshot and deploy it on
> >>our private repository, so that we always have a latest snapshot
> deployed
> >>every day (and an up to date doc).
> >>To be able to achieve this, the second schedule should start a "forced"
> >>build...(using a argument ? )
> >>
> >>A workaround would be to have the project twice in continuum, one copy
> >>with the default schedule and one copy with the second schedule, but i'd
> >>prefere to avoid this overhead...It still has an advantage though : if
> no
> >>changes were made at all one day, then there wouldn't be an unnecessary
> >>deployment the next night.
> >>
> >>Do you see how I can do that ? Or any better suggestion ?
> >>
> >>
> >>Thanks for your help
> >>
> >>--
> >>Matthew Vanbiervliet
> >>Accelior Consulting
> >>http://www.accelior.com
> >>
> >
> >
> >
> >
> > --
> > Matthew Vanbiervliet
> > Accelior Consulting
> > http://www.accelior.com
> >
>
>


--
Matthew Vanbiervliet
Accelior Consulting
http://www.accelior.com

Re: continuum scheduled "forced" build

Posted by Emmanuel Venisse <em...@venisse.net>.
I fixed this problem in svn but i need to do some more tests before the release of Continuum 1.0.3

Emmanuel

Matthew Vanbiervliet a écrit :
> I've just seen that there was an open issue about this...
> Anyway, your suggestions are welcome :-)
> 
> 
> 
> On 2/22/06, Matthew Vanbiervliet <mv...@gmail.com> wrote:
> 
>>Hi,
>>
>>Is there a way to force Continuum to build a project even if there are no
>>changes in the source repository ?
>>What I try to achieve is to have Continuum build a snapshot using a
>>different profile every night, even if there were no changes. I have two
>>schedules attached to the project :
>>
>>- The default one which runs every hour
>>- A second one that runs at 1 AM every night.
>>
>>Now the problem is that, when I commit changes, let's say at 7:35 PM, the
>>scheduled build at 8 pm will detect these changes and perform a build.
>>At 1 AM, a cvs update is run, but no changes are detected since there
>>weren't any new commits since 7:35 PM...
>>
>>I'd like to have this specific build, build a snapshot and deploy it on
>>our private repository, so that we always have a latest snapshot deployed
>>every day (and an up to date doc).
>>To be able to achieve this, the second schedule should start a "forced"
>>build...(using a argument ? )
>>
>>A workaround would be to have the project twice in continuum, one copy
>>with the default schedule and one copy with the second schedule, but i'd
>>prefere to avoid this overhead...It still has an advantage though : if no
>>changes were made at all one day, then there wouldn't be an unnecessary
>>deployment the next night.
>>
>>Do you see how I can do that ? Or any better suggestion ?
>>
>>
>>Thanks for your help
>>
>>--
>>Matthew Vanbiervliet
>>Accelior Consulting
>>http://www.accelior.com
>>
> 
> 
> 
> 
> --
> Matthew Vanbiervliet
> Accelior Consulting
> http://www.accelior.com
> 


Re: continuum scheduled "forced" build

Posted by Matthew Vanbiervliet <mv...@gmail.com>.
I've just seen that there was an open issue about this...
Anyway, your suggestions are welcome :-)



On 2/22/06, Matthew Vanbiervliet <mv...@gmail.com> wrote:
>
> Hi,
>
> Is there a way to force Continuum to build a project even if there are no
> changes in the source repository ?
> What I try to achieve is to have Continuum build a snapshot using a
> different profile every night, even if there were no changes. I have two
> schedules attached to the project :
>
> - The default one which runs every hour
> - A second one that runs at 1 AM every night.
>
> Now the problem is that, when I commit changes, let's say at 7:35 PM, the
> scheduled build at 8 pm will detect these changes and perform a build.
> At 1 AM, a cvs update is run, but no changes are detected since there
> weren't any new commits since 7:35 PM...
>
> I'd like to have this specific build, build a snapshot and deploy it on
> our private repository, so that we always have a latest snapshot deployed
> every day (and an up to date doc).
> To be able to achieve this, the second schedule should start a "forced"
> build...(using a argument ? )
>
> A workaround would be to have the project twice in continuum, one copy
> with the default schedule and one copy with the second schedule, but i'd
> prefere to avoid this overhead...It still has an advantage though : if no
> changes were made at all one day, then there wouldn't be an unnecessary
> deployment the next night.
>
> Do you see how I can do that ? Or any better suggestion ?
>
>
> Thanks for your help
>
> --
> Matthew Vanbiervliet
> Accelior Consulting
> http://www.accelior.com
>



--