Hi all,

Since Flink 1.14 is already code freeze, but for FLIP-147 we still have the last piece of work left,
thus we would like to start a discussion about merging them after code freeze. 

Currently there are two non-bug-fix issues left and since
1. FLINK-23512: The PR is in fact approved before code freeze, but we failed to get a green CI test
before code freeze; and it mainly added a check to illegal job graph modification with finished state, 
which should only have a limit affection.
2. FLINK-21090: The PR complements the ITCase for the final checkpoint functionality, currently it is 
blocked by several on-going small bug fixes. This should not affect the normal processes.

Thus if no objections we would tend to merge them to complete FLIP-147. 

Very thanks everyone!

Best,
Yun

Re: Re: [DISCUSS] Merge the Last Piece of FLIP-147 After Code Freeze

Posted by Yun Gao <yu...@aliyun.com.INVALID>.
Very thanks @Xintong and everyone! I'll merge the remaining PRs~ Very sorry for
the inconvinient brought. 

Best,
Yun



 ------------------Original Mail ------------------
Sender:Xintong Song <to...@gmail.com>
Send Date:Fri Aug 20 09:43:24 2021
Recipients:dev <de...@flink.apache.org>, Yun Gao <yu...@aliyun.com>
Subject:Re: [DISCUSS] Merge the Last Piece of FLIP-147 After Code Freeze

I think we are good to go on this, since there's no objections within 48h.
Thank you~
Xintong Song


On Tue, Aug 17, 2021 at 5:11 PM Xintong Song <to...@gmail.com> wrote:

For the record, this has been brought up on the release testing sync earlier today, without objections from the meeting. Per the previous email [1], we brought this to the mailing list discussion. 

If you need to merge a new feature after the freeze, please open a discussion on the dev@ list. If there are no objections by a PMC member within 48 (workday) hours, the feature can be merged.

Thank you~
Xintong Song

[1] https://lists.apache.org/thread.html/rc6cd39f467c42873ca2e9fa31dbe117c267d22ee3aa69bd8071219ff%40%3Cdev.flink.apache.org%3E
On Tue, Aug 17, 2021 at 4:43 PM Yun Gao <yu...@aliyun.com.invalid> wrote:
Hi all,

Since Flink 1.14 is already code freeze, but for FLIP-147 we still have the last piece of work left,
thus we would like to start a discussion about merging them after code freeze. 

Currently there are two non-bug-fix issues left and since
1. FLINK-23512: The PR is in fact approved before code freeze, but we failed to get a green CI test
before code freeze; and it mainly added a check to illegal job graph modification with finished state, 
which should only have a limit affection.
2. FLINK-21090: The PR complements the ITCase for the final checkpoint functionality, currently it is 
blocked by several on-going small bug fixes. This should not affect the normal processes.

Thus if no objections we would tend to merge them to complete FLIP-147. 

Very thanks everyone!

Best,
Yun

Re: [DISCUSS] Merge the Last Piece of FLIP-147 After Code Freeze

Posted by Xintong Song <to...@gmail.com>.
I think we are good to go on this, since there's no objections within 48h.

Thank you~

Xintong Song



On Tue, Aug 17, 2021 at 5:11 PM Xintong Song <to...@gmail.com> wrote:

> For the record, this has been brought up on the release testing sync
> earlier today, without objections from the meeting. Per the previous email
> [1], we brought this to the mailing list discussion.
>
> If you need to merge a new feature after the freeze, please open a
>> discussion on the dev@ list. If there are no objections by a PMC member
>> within 48 (workday) hours, the feature can be merged.
>>
>
> Thank you~
>
> Xintong Song
>
>
> [1]
> https://lists.apache.org/thread.html/rc6cd39f467c42873ca2e9fa31dbe117c267d22ee3aa69bd8071219ff%40%3Cdev.flink.apache.org%3E
>
> On Tue, Aug 17, 2021 at 4:43 PM Yun Gao <yu...@aliyun.com.invalid>
> wrote:
>
>> Hi all,
>>
>> Since Flink 1.14 is already code freeze, but for FLIP-147 we still have
>> the last piece of work left,
>> thus we would like to start a discussion about merging them after code
>> freeze.
>>
>> Currently there are two non-bug-fix issues left and since
>> 1. FLINK-23512: The PR is in fact approved before code freeze, but we
>> failed to get a green CI test
>> before code freeze; and it mainly added a check to illegal job graph
>> modification with finished state,
>> which should only have a limit affection.
>> 2. FLINK-21090: The PR complements the ITCase for the final checkpoint
>> functionality, currently it is
>> blocked by several on-going small bug fixes. This should not affect the
>> normal processes.
>>
>> Thus if no objections we would tend to merge them to complete FLIP-147.
>>
>> Very thanks everyone!
>>
>> Best,
>> Yun
>
>

Re: [DISCUSS] Merge the Last Piece of FLIP-147 After Code Freeze

Posted by Xintong Song <to...@gmail.com>.
For the record, this has been brought up on the release testing sync
earlier today, without objections from the meeting. Per the previous email
[1], we brought this to the mailing list discussion.

If you need to merge a new feature after the freeze, please open a
> discussion on the dev@ list. If there are no objections by a PMC member
> within 48 (workday) hours, the feature can be merged.
>

Thank you~

Xintong Song


[1]
https://lists.apache.org/thread.html/rc6cd39f467c42873ca2e9fa31dbe117c267d22ee3aa69bd8071219ff%40%3Cdev.flink.apache.org%3E

On Tue, Aug 17, 2021 at 4:43 PM Yun Gao <yu...@aliyun.com.invalid>
wrote:

> Hi all,
>
> Since Flink 1.14 is already code freeze, but for FLIP-147 we still have
> the last piece of work left,
> thus we would like to start a discussion about merging them after code
> freeze.
>
> Currently there are two non-bug-fix issues left and since
> 1. FLINK-23512: The PR is in fact approved before code freeze, but we
> failed to get a green CI test
> before code freeze; and it mainly added a check to illegal job graph
> modification with finished state,
> which should only have a limit affection.
> 2. FLINK-21090: The PR complements the ITCase for the final checkpoint
> functionality, currently it is
> blocked by several on-going small bug fixes. This should not affect the
> normal processes.
>
> Thus if no objections we would tend to merge them to complete FLIP-147.
>
> Very thanks everyone!
>
> Best,