You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Angela Schreiber (Jira)" <ji...@apache.org> on 2020/01/24 15:57:00 UTC

[jira] [Commented] (OAK-8871) Build Jackrabbit Oak #2580 failed

    [ https://issues.apache.org/jira/browse/OAK-8871?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17023043#comment-17023043 ] 

Angela Schreiber commented on OAK-8871:
---------------------------------------

hmm... i don't know how the changes made with OAK_8870 are related to the failing test, which is:

{code}
[ERROR]   DocumentDiscoveryLiteServiceCrashTest.testTwoNodesWithCrashAndLongduringRecovery ยป Runtime
{code}

[~reschke], do you know if that test case has been prone to failure before?

> Build Jackrabbit Oak #2580 failed
> ---------------------------------
>
>                 Key: OAK-8871
>                 URL: https://issues.apache.org/jira/browse/OAK-8871
>             Project: Jackrabbit Oak
>          Issue Type: Bug
>          Components: continuous integration
>            Reporter: Hudson
>            Priority: Major
>
> No description is provided
> The build Jackrabbit Oak #2580 has failed.
> First failed run: [Jackrabbit Oak #2580|https://builds.apache.org/job/Jackrabbit%20Oak/2580/] [console log|https://builds.apache.org/job/Jackrabbit%20Oak/2580/console]



--
This message was sent by Atlassian Jira
(v8.3.4#803005)