You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Duo Zhang (JIRA)" <ji...@apache.org> on 2018/07/23 06:44:00 UTC
[jira] [Assigned] (HBASE-20881) Introduce a region transition
procedure to handle all the state transition for a region
[ https://issues.apache.org/jira/browse/HBASE-20881?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Duo Zhang reassigned HBASE-20881:
---------------------------------
Assignee: Duo Zhang
> Introduce a region transition procedure to handle all the state transition for a region
> ---------------------------------------------------------------------------------------
>
> Key: HBASE-20881
> URL: https://issues.apache.org/jira/browse/HBASE-20881
> Project: HBase
> Issue Type: Sub-task
> Reporter: Duo Zhang
> Assignee: Duo Zhang
> Priority: Major
>
> Now have an AssignProcedure, an UnssignProcedure, and also a MoveRegionProcedure which schedules an AssignProcedure and an UnssignProcedure to move a region. This makes the logic a bit complicated, as MRP is not a RIT, so when SCP can not interrupt it directly...
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)