You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Andras Gyori (Jira)" <ji...@apache.org> on 2021/03/22 14:05:00 UTC

[jira] [Commented] (YARN-9936) Support vector of capacity percentages in Capacity Scheduler configuration

    [ https://issues.apache.org/jira/browse/YARN-9936?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17306212#comment-17306212 ] 

Andras Gyori commented on YARN-9936:
------------------------------------

I can see that it is not actively developed, so I take it over. Please feel free to retake it, if you want to start working on it.

> Support vector of capacity percentages in Capacity Scheduler configuration
> --------------------------------------------------------------------------
>
>                 Key: YARN-9936
>                 URL: https://issues.apache.org/jira/browse/YARN-9936
>             Project: Hadoop YARN
>          Issue Type: Sub-task
>          Components: capacity scheduler
>            Reporter: Zoltan Siegl
>            Assignee: Zoltan Siegl
>            Priority: Major
>         Attachments: Capacity Scheduler support of “vector of resources percentage”.pdf
>
>
> Currently, the Capacity Scheduler queue configuration supports two ways to set queue capacity.
>  * In percentage of all available resources as a float ( eg. 25.0 ) means 25% of the resources of its parent queue for all resource types equally (eg. 25% of all memory, 25% of all CPU cores, and 25% of all available GPU in the cluster) The percentages of all queues has to add up to 100%.
>  * In an absolute amount of resources ( e.g. memory=4GB,vcores=20,yarn.io/gpu=4 ). The amount of all resources in the queues has to be less than or equal to all resources in the cluster.
> Apart from these two already existing ways, there is a demand to add capacity percentage of each available resource type separately. (eg. {{memory=20%,vcores=40%,yarn.io/gpu=100%}}).
>  At the same time, a similar concept should be included with queues maximum-capacity as well.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-issues-help@hadoop.apache.org