You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@airavata.apache.org by Amila Jayasekara <th...@gmail.com> on 2012/12/14 12:33:46 UTC
Integration tests module in Airavata
Hi All,
We recently added integration-tests module to airavata [1]. This
includes primary tests to verify a complete airavata deployment.
Please feel free to augment these integration tests and widen test
scope.
Thanks
Amila
[1] https://issues.apache.org/jira/browse/AIRAVATA-662
Re: Integration tests module in Airavata
Posted by Amila Jayasekara <th...@gmail.com>.
Yes. Still there are few "SEVERE" level log messages popping out
during server startup and server shutdown. As per now server log
scanning tests are disabled. Need work with Lahiru and others to fix
these "SEVERE" level logs (during startup and shutdown) and enable all
tests.
Thanks
Amila
On Fri, Dec 14, 2012 at 8:43 AM, Suresh Marru <sm...@apache.org> wrote:
> Thanks Amila for the contribution. These tests should help smoothen the development a lot. We need to carefully look at Jenkins outputs and see which failures we have to mark build failure. I was just looking at a sample [2]
>
> Cheers,
> Suresh
>
> [2] - https://builds.apache.org/job/Apache%20Airavata/org.apache.airavata$integration-tests/lastCompletedBuild/consoleText
>
> On Dec 14, 2012, at 6:33 AM, Amila Jayasekara <th...@gmail.com> wrote:
>
>> Hi All,
>>
>> We recently added integration-tests module to airavata [1]. This
>> includes primary tests to verify a complete airavata deployment.
>> Please feel free to augment these integration tests and widen test
>> scope.
>>
>> Thanks
>> Amila
>>
>>
>> [1] https://issues.apache.org/jira/browse/AIRAVATA-662
>
Re: Integration tests module in Airavata
Posted by Suresh Marru <sm...@apache.org>.
Thanks Amila for the contribution. These tests should help smoothen the development a lot. We need to carefully look at Jenkins outputs and see which failures we have to mark build failure. I was just looking at a sample [2]
Cheers,
Suresh
[2] - https://builds.apache.org/job/Apache%20Airavata/org.apache.airavata$integration-tests/lastCompletedBuild/consoleText
On Dec 14, 2012, at 6:33 AM, Amila Jayasekara <th...@gmail.com> wrote:
> Hi All,
>
> We recently added integration-tests module to airavata [1]. This
> includes primary tests to verify a complete airavata deployment.
> Please feel free to augment these integration tests and widen test
> scope.
>
> Thanks
> Amila
>
>
> [1] https://issues.apache.org/jira/browse/AIRAVATA-662