You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@drill.apache.org by "Pritesh Maker (JIRA)" <ji...@apache.org> on 2017/08/25 17:31:02 UTC

[jira] [Updated] (DRILL-4525) Query with BETWEEN clause on Date and Timestamp values fails with Validation Error

     [ https://issues.apache.org/jira/browse/DRILL-4525?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Pritesh Maker updated DRILL-4525:
---------------------------------
    Fix Version/s:     (was: 1.9.0)

> Query with BETWEEN clause on Date and Timestamp values fails with Validation Error
> ----------------------------------------------------------------------------------
>
>                 Key: DRILL-4525
>                 URL: https://issues.apache.org/jira/browse/DRILL-4525
>             Project: Apache Drill
>          Issue Type: Bug
>          Components: Query Planning & Optimization
>            Reporter: Abhishek Girish
>            Assignee: Sean Hsuan-Yi Chu
>            Priority: Critical
>
> Query: (simplified variant of TPC-DS Query37)
> {code}
> SELECT
>        *
> FROM   
>        date_dim
> WHERE   
>        d_date BETWEEN Cast('1999-03-06' AS DATE) AND      (
>                   Cast('1999-03-06' AS DATE) + INTERVAL '60' day)
> LIMIT 10;
> {code}
> Error:
> {code}
> Error: VALIDATION ERROR: From line 6, column 8 to line 7, column 64: Cannot apply 'BETWEEN ASYMMETRIC' to arguments of type '<ANY> BETWEEN ASYMMETRIC <DATE> AND <TIMESTAMP(0)>'. Supported form(s): '<COMPARABLE_TYPE> BETWEEN <COMPARABLE_TYPE> AND <COMPARABLE_TYPE>'
> SQL Query null
> [Error Id: 223fb37c-f561-4a37-9283-871dc6f4d6d0 on abhi2:31010] (state=,code=0)
> {code}
> This is a regression from 1.6.0. 



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)