You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Jason Bray (JIRA)" <ji...@apache.org> on 2013/06/18 23:32:22 UTC

[jira] [Updated] (HBASE-8762) Performance/operational penalty when calling HTable.get with a list of one Get

     [ https://issues.apache.org/jira/browse/HBASE-8762?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Jason Bray updated HBASE-8762:
------------------------------

    Status: Open  (was: Patch Available)
    
> Performance/operational penalty when calling HTable.get with a list of one Get
> ------------------------------------------------------------------------------
>
>                 Key: HBASE-8762
>                 URL: https://issues.apache.org/jira/browse/HBASE-8762
>             Project: HBase
>          Issue Type: Bug
>          Components: Client
>            Reporter: Jason Bray
>            Priority: Minor
>
> There are two implications to calling HTable.get with a list of one Get.
> 1. The overhead of processBatch is paid unnecessarily, which is not insignificant.
> 2. The get requests show up as a 'multi' when reviewing RPC handlers, when the request should just be a single Get.  It seems likely that there are other places in logs/ui it shows up as a multi as well.
> To give some context to the overhead, here are some timings performed by a member of our team:
> In a very simple test, of reading the same key 100 times, taking the time it took, and then repeating this 10 times (1000 total gets), the times are as follows (excluding the actual first iteration as there was considerable HBase warm-up times on the JVM for establishing connections):
> ||Iteration||Batch (in ms)||Single (in ms)||
> |1|2255|815| 
> |2|1545|823| 
> |3|1427|742| 
> |4|1451|721| 
> |5|1480|775| 
> |6|1379|735| 
> |7|1657|775| 
> |8|1392|804|
> While I can see the argument that callers should use the single Get method signature, the cost implications are somewhat surprising and it's very easy to be smart in this case.  We simply need to have HTable.get(List<Get>) delegate to HTable.get(<Get>) if the list has one Get.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira