You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@nifi.apache.org by "Peter Wicks (JIRA)" <ji...@apache.org> on 2019/02/01 20:08:00 UTC

[jira] [Updated] (NIFI-5722) Expose Penalty Remaining Duration

     [ https://issues.apache.org/jira/browse/NIFI-5722?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Peter Wicks updated NIFI-5722:
------------------------------
    Fix Version/s: 1.9.0

> Expose Penalty Remaining Duration
> ---------------------------------
>
>                 Key: NIFI-5722
>                 URL: https://issues.apache.org/jira/browse/NIFI-5722
>             Project: Apache NiFi
>          Issue Type: New Feature
>          Components: Core Framework, Core UI
>            Reporter: Peter Wicks
>            Assignee: Peter Wicks
>            Priority: Minor
>             Fix For: 1.9.0
>
>         Attachments: FlowFIleDetailsWithPenaltyTime.PNG, QueueWithPenaltyTime.PNG
>
>          Time Spent: 40m
>  Remaining Estimate: 0h
>
> When a FlowFile is penalized a user is only able to see that it is penalized in List Queue and FlowFile details, but not for how much longer the FlowFile will be penalized.
> The List Queue details need to show remaining penalty duration, along with the FlowFile details. This should replace the existing 'Yes' value.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)