You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hive.apache.org by "Haymant Mangla (Jira)" <ji...@apache.org> on 2021/03/26 11:07:00 UTC
[jira] [Assigned] (HIVE-24946) Handle failover case during Repl
Load
[ https://issues.apache.org/jira/browse/HIVE-24946?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Haymant Mangla reassigned HIVE-24946:
-------------------------------------
> Handle failover case during Repl Load
> -------------------------------------
>
> Key: HIVE-24946
> URL: https://issues.apache.org/jira/browse/HIVE-24946
> Project: Hive
> Issue Type: New Feature
> Reporter: Haymant Mangla
> Assignee: Haymant Mangla
> Priority: Major
>
> * Update metric during load to capture the readiness for failover
> * Handle repl.source.for and repl.target.for properties on target cluster (Enable repl.source.for and disable repl.target.for)
> * Prepare the dump directory to be used during failover first dump operation
--
This message was sent by Atlassian Jira
(v8.3.4#803005)