You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@directory.apache.org by "Shawn McKinney (JIRA)" <ji...@apache.org> on 2015/05/10 10:26:00 UTC
[jira] [Resolved] (FC-98) fortress-web date constraint bugs
[ https://issues.apache.org/jira/browse/FC-98?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Shawn McKinney resolved FC-98.
------------------------------
Resolution: Fixed
> fortress-web date constraint bugs
> ---------------------------------
>
> Key: FC-98
> URL: https://issues.apache.org/jira/browse/FC-98
> Project: FORTRESS
> Issue Type: Bug
> Affects Versions: 1.0.0-RC40
> Reporter: Shawn McKinney
> Fix For: 1.0.0-RC41
>
>
> Per Oleksandr:
> Problem #2:
> Role’s temporal constraints End Date 09/01/2111 is shown as 21110801 in the role list/table.
> Problem #3:
> Roles defined via fortress-web lose Begin Time in the table view after modifying lock dates.
> Problem #4:
> Modification of Begin Date (or Begin Time) leads to the month change in Begin Lock and End Lock.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)