You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Matthias Pohl (Jira)" <ji...@apache.org> on 2024/08/29 15:24:00 UTC

[jira] [Assigned] (FLINK-36168) AdaptiveSchedulerTest doesn't follow the production lifecycle

     [ https://issues.apache.org/jira/browse/FLINK-36168?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Matthias Pohl reassigned FLINK-36168:
-------------------------------------

    Assignee: Zdenek Tison

> AdaptiveSchedulerTest doesn't follow the production lifecycle
> -------------------------------------------------------------
>
>                 Key: FLINK-36168
>                 URL: https://issues.apache.org/jira/browse/FLINK-36168
>             Project: Flink
>          Issue Type: Sub-task
>            Reporter: Matthias Pohl
>            Assignee: Zdenek Tison
>            Priority: Major
>              Labels: pull-request-available
>
> The {{AdaptiveSchedulerTest}} doesn't follow the production lifecycle properly: The executor representing the main thread is shutting down before the AdaptiveScheduler is closed (or more precisely, the scheduler isn't closed at all in most of the tests).
> This can cause issues when shutting down the executor and tasks still being scheduled and not properly cleaned up. This issue is about fixing the test in this regards.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)