You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@camel.apache.org by "Viktor Khoroshko (JIRA)" <ji...@apache.org> on 2017/08/04 11:56:00 UTC
[jira] [Updated] (CAMEL-11632) QuartzScheduledPollConsumerScheduler
causes trigger misfires on each application start
[ https://issues.apache.org/jira/browse/CAMEL-11632?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Viktor Khoroshko updated CAMEL-11632:
-------------------------------------
Summary: QuartzScheduledPollConsumerScheduler causes trigger misfires on each application start (was: QuartzScheduledPollConsumerScheduler causes trigger misfires on each application restart)
> QuartzScheduledPollConsumerScheduler causes trigger misfires on each application start
> --------------------------------------------------------------------------------------
>
> Key: CAMEL-11632
> URL: https://issues.apache.org/jira/browse/CAMEL-11632
> Project: Camel
> Issue Type: Bug
> Components: camel-quartz2
> Affects Versions: 2.19.0
> Environment: *strong text*
> Reporter: Viktor Khoroshko
>
> Recently I noticed that on application start Quartz founds and triggers misfired triggers:
> {code:java}
> INFO o.s.s.q.LocalDataSourceJobStore - Handling 1 trigger(s) that missed their scheduled fire-time.
> {code}
> That wasn't not the realistic case in my scenario - since I could see in a database that NEXT_FIRE_TIME is much ahead of the current time.
> After digging a little I found the issue in the *QuartzScheduledPollConsumerScheduler*:
> {code:java}
> // Ensure the cron schedule is updated
> CronTrigger newTrigger = existingTrigger.getTriggerBuilder().withSchedule(CronScheduleBuilder.cronSchedule(getCron()).inTimeZone(getTimeZone())).build();
> quartzScheduler.rescheduleJob(triggerKey, newTrigger);
> {code}
> There 2 issues here:
> 1. Job is rescheduled even if nothing has been changed (i.e. cron expression, crom timezone)
> 2. existingTrigger.getTriggerBuilder() returns trigger builder with START_TIME of existing trigger which, surely, is the past. This is causing the described bug - NEXT_FIRE_TIME is calculated based on the old START_TIME and is in the past also. So rescheduled trigger becomes misfired trigger immediately.
> Proposal:
> 1. Do not reschedule job is nothing has been changed.
> 2. If job needs to be rescheduler - make sure to set START_TIME to a current date.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)