You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "ASF GitHub Bot (Jira)" <ji...@apache.org> on 2026/06/22 08:59:00 UTC

[jira] [Updated] (HBASE-30249) Make TestSyncReplicationStandbyKillMaster stable

     [ https://issues.apache.org/jira/browse/HBASE-30249?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

ASF GitHub Bot updated HBASE-30249:
-----------------------------------
    Labels: pull-request-available  (was: )

> Make TestSyncReplicationStandbyKillMaster stable
> ------------------------------------------------
>
>                 Key: HBASE-30249
>                 URL: https://issues.apache.org/jira/browse/HBASE-30249
>             Project: HBase
>          Issue Type: Sub-task
>          Components: Replication, test
>            Reporter: Duo Zhang
>            Assignee: Duo Zhang
>            Priority: Major
>              Labels: pull-request-available
>
> After analyzing, the problem is that, we want to test master switch when transiting, but actually, the procedure can be finished within 1 second but we will kill mastr after 2 seconds, so we just test nothing, and the master killing operation will mess up the code in tearDown and fail the test...



--
This message was sent by Atlassian Jira
(v8.20.10#820010)