You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@flink.apache.org by "Till Rohrmann (Jira)" <ji...@apache.org> on 2021/11/10 15:51:00 UTC
[jira] [Created] (FLINK-24867) E2e tests take longer than the
maximum 310 minutes on AZP
Till Rohrmann created FLINK-24867:
-------------------------------------
Summary: E2e tests take longer than the maximum 310 minutes on AZP
Key: FLINK-24867
URL: https://issues.apache.org/jira/browse/FLINK-24867
Project: Flink
Issue Type: Bug
Components: Build System / Azure Pipelines, Tests
Affects Versions: 1.13.3
Reporter: Till Rohrmann
The e2e tests took longer than the maximum 310 minutes in one AZP run. This made the build step fail.
{code}
##[error]The job running on agent Azure Pipelines 9 ran longer than the maximum time of 310 minutes. For more information, see https://go.microsoft.com/fwlink/?linkid=2077134
Agent: Azure Pipelines 9
Started: Today at 09:25
Duration: 5h 10m 11s
{code}
https://dev.azure.com/apache-flink/apache-flink/_build/results?buildId=26257&view=logs&j=c88eea3b-64a0-564d-0031-9fdcd7b8abee
--
This message was sent by Atlassian Jira
(v8.20.1#820001)