You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ambari.apache.org by "Hudson (JIRA)" <ji...@apache.org> on 2017/09/15 15:40:01 UTC

[jira] [Commented] (AMBARI-21967) Exception was thrown while starting Patch Rolling/Express Upgrade when upgrade failure tolerance option is selected

    [ https://issues.apache.org/jira/browse/AMBARI-21967?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16168036#comment-16168036 ] 

Hudson commented on AMBARI-21967:
---------------------------------

SUCCESS: Integrated in Jenkins build Ambari-branch-2.6 #222 (See [https://builds.apache.org/job/Ambari-branch-2.6/222/])
AMBARI-21967. Exception was thrown while starting Patch Rolling/Express (ncole: [http://git-wip-us.apache.org/repos/asf?p=ambari.git&a=commit&h=8217f4c1dda8476c917435de81ee39275faa60d9])
* (edit) ambari-server/src/main/java/org/apache/ambari/server/state/UpgradeHelper.java
* (edit) ambari-server/src/test/java/org/apache/ambari/server/state/UpgradeHelperTest.java


> Exception was thrown while starting Patch Rolling/Express Upgrade when upgrade failure tolerance option is selected
> -------------------------------------------------------------------------------------------------------------------
>
>                 Key: AMBARI-21967
>                 URL: https://issues.apache.org/jira/browse/AMBARI-21967
>             Project: Ambari
>          Issue Type: Bug
>          Components: ambari-server
>            Reporter: Nate Cole
>            Assignee: Nate Cole
>            Priority: Critical
>             Fix For: 2.6.0
>
>         Attachments: AMBARI-21967.patch
>
>
> Missed a situation where the service-check merging logic failed.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)