You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Davide Giannella (JIRA)" <ji...@apache.org> on 2017/10/13 09:00:26 UTC
[jira] [Closed] (OAK-5788) Perform update of single node in one
remote call if possible
[ https://issues.apache.org/jira/browse/OAK-5788?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Davide Giannella closed OAK-5788.
---------------------------------
Bulk close for 1.7.9
> Perform update of single node in one remote call if possible
> ------------------------------------------------------------
>
> Key: OAK-5788
> URL: https://issues.apache.org/jira/browse/OAK-5788
> Project: Jackrabbit Oak
> Issue Type: Improvement
> Components: documentmk
> Reporter: Chetan Mehrotra
> Assignee: Marcel Reutegger
> Labels: performance
> Fix For: 1.8, 1.7.9
>
> Attachments: OAK-5788.patch
>
>
> If a single node is modified in a commit then currently it performs 2 remote calls
> # The actual update
> # Update of commit root
> as for single node update commitRoot == node being updated we can optimize this case to see if both operations can be done in same call
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)