You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@falcon.apache.org by "Balu Vellanki (JIRA)" <ji...@apache.org> on 2015/10/02 00:10:27 UTC
[jira] [Created] (FALCON-1505) Falcon fails to re-schedule a
succeeded entity after validity time is updated.
Balu Vellanki created FALCON-1505:
-------------------------------------
Summary: Falcon fails to re-schedule a succeeded entity after validity time is updated.
Key: FALCON-1505
URL: https://issues.apache.org/jira/browse/FALCON-1505
Project: Falcon
Issue Type: Bug
Affects Versions: 0.7
Reporter: Balu Vellanki
Assignee: Balu Vellanki
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)