You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Gyula Fora (Jira)" <ji...@apache.org> on 2023/11/17 13:25:00 UTC

[jira] [Assigned] (FLINK-30529) Use simple cancel for savepoint upgrades on failing jobs

     [ https://issues.apache.org/jira/browse/FLINK-30529?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Gyula Fora reassigned FLINK-30529:
----------------------------------

    Assignee: Zhenqiu Huang

> Use simple cancel for savepoint upgrades on failing jobs
> --------------------------------------------------------
>
>                 Key: FLINK-30529
>                 URL: https://issues.apache.org/jira/browse/FLINK-30529
>             Project: Flink
>          Issue Type: Improvement
>          Components: Kubernetes Operator
>            Reporter: Gyula Fora
>            Assignee: Zhenqiu Huang
>            Priority: Major
>
> In some cases where savepoint upgrades are required we should consider simply cancelling the job and observing the last checkpoint/savepoint available.
> We should think through what are the caveats of this approach but this could help upgrade some clusters that would be stuck now.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)