You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@drill.apache.org by "Jason Altekruse (JIRA)" <ji...@apache.org> on 2013/07/03 02:17:20 UTC
[jira] [Created] (DRILL-138) Fill basic optimizer with new Physical
Operators
Jason Altekruse created DRILL-138:
-------------------------------------
Summary: Fill basic optimizer with new Physical Operators
Key: DRILL-138
URL: https://issues.apache.org/jira/browse/DRILL-138
Project: Apache Drill
Issue Type: New Feature
Reporter: Jason Altekruse
As new Physical Operators are completed they must be added to the basic optimizer for logical to physical plan conversion.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira