You are viewing a plain text version of this content. The canonical link for it is here.
Posted to notifications@ofbiz.apache.org by "Deepak Dixit (JIRA)" <ji...@apache.org> on 2016/12/17 08:43:58 UTC

[jira] [Commented] (OFBIZ-7111) Total Actual cost of production run need to be passed on to produced stock's unit cost for completed production run

    [ https://issues.apache.org/jira/browse/OFBIZ-7111?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15756650#comment-15756650 ] 

Deepak Dixit commented on OFBIZ-7111:
-------------------------------------

Can we close this issue?

> Total Actual cost of production run need to be passed on to produced stock's unit cost for completed production run
> -------------------------------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-7111
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-7111
>             Project: OFBiz
>          Issue Type: New Feature
>          Components: manufacturing
>    Affects Versions: Release Branch 14.12, 14.12.01, Release Branch 15.12, 15.12.01
>            Reporter: Swapnil Shah
>            Assignee: Divesh Dutta
>         Attachments: ActualCostXfer_1.png, ActualCostXfer_2.png, OFBIZ-7111.patch, OFBIZ-7111_V2.patch
>
>
> Currently as soon as item is produced into inventory once production run is completed then inventory get created with ZERO unit cost. 
> We could pass on the total actual cost (Material+Labor+Resource etc.) to Produced Item's inventory item i.e. = Total Actual Cost/ Produced in Stock 
> Please refer to attached screenshot for reference



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)