You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@nifi.apache.org by "Bryan Bende (JIRA)" <ji...@apache.org> on 2018/03/13 16:50:00 UTC
[jira] [Updated] (NIFI-4969) Failed to import versioned flow when
processor uses "Event Driven" scheduling
[ https://issues.apache.org/jira/browse/NIFI-4969?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Bryan Bende updated NIFI-4969:
------------------------------
Status: Patch Available (was: Open)
> Failed to import versioned flow when processor uses "Event Driven" scheduling
> -----------------------------------------------------------------------------
>
> Key: NIFI-4969
> URL: https://issues.apache.org/jira/browse/NIFI-4969
> Project: Apache NiFi
> Issue Type: Bug
> Affects Versions: 1.5.0
> Reporter: Bryan Bende
> Assignee: Bryan Bende
> Priority: Major
>
> Create a flow where a processor has scheduling strategy set to event-driven with concurrent tasks set to 0. Start version control on the flow, and them try to import a new process group using the flow from previous step.
> The error is because during import we set the concurrent tasks value before the scheduling strategy, and StandardProcessorNode line 630 throws an exception if the tasks is < 1 and strategy is not event driven.
> The exception also does not report any message so it is hard to figure out what the issue is.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)