You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Duo Zhang (Jira)" <ji...@apache.org> on 2026/02/26 04:12:00 UTC
[jira] [Created] (HBASE-29929) Separate hadoop3 backwards compatibility checks in nightly job to new jenkins job
Duo Zhang created HBASE-29929:
---------------------------------
Summary: Separate hadoop3 backwards compatibility checks in nightly job to new jenkins job
Key: HBASE-29929
URL: https://issues.apache.org/jira/browse/HBASE-29929
Project: HBase
Issue Type: Task
Components: jenkins
Reporter: Duo Zhang
Now our nightly job only runs per 3 days, this is because running the full UTs is the most time consuming work and in pre commit we will run related UTs so typically we do not need to run all UTs everyday.
But for hadoop3 backwards compatibility jobs, since it is less time comsuming, and we do not run it in pre commit job, we'd better run it more frequently to see if there are any failures.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)