You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ambari.apache.org by "Swapan Shridhar (JIRA)" <ji...@apache.org> on 2017/10/23 04:45:00 UTC
[jira] [Commented] (AMBARI-22154) Install and upgrade options are
shown for current and already upgraded stack versions
[ https://issues.apache.org/jira/browse/AMBARI-22154?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16214626#comment-16214626 ]
Swapan Shridhar commented on AMBARI-22154:
------------------------------------------
[~ncole] is it resolved ? If yes, please close it, else move it to 2.6.1 . Thx.
> Install and upgrade options are shown for current and already upgraded stack versions
> --------------------------------------------------------------------------------------
>
> Key: AMBARI-22154
> URL: https://issues.apache.org/jira/browse/AMBARI-22154
> Project: Ambari
> Issue Type: Bug
> Components: ambari-upgrade
> Affects Versions: 2.6.0
> Environment: ambari-server --version 2.6.0.0-185
> Reporter: Supreeth Sharma
> Priority: Critical
> Fix For: 2.6.0
>
>
> This scenario looks intermittent.
> Live cluster where issue occured: http://172.27.69.192:8080/#/main/admin/stack/versions
> Issue 1 : After performing downgrade, it started to show 'out of sync' for all previously upgraded stack including base stack. Attaching the screenshot.
> Issue 2 : Its allowing to install previously installed stack including base.
> Test steps performed :
> 1) Performed ambari upgrade from 2.5.2.0 to 2.6.0.0-185
> 2) Performed the patch upgrade in batch of 3.
> 3) Performed the downgrade before finalizing the 3rd upgrade.
> 4) After performing downgrade, UI is showing out of sync for previously installed stacks and allowing them to reinstall.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)