You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@falcon.apache.org by "Sowmya Ramesh (JIRA)" <ji...@apache.org> on 2015/05/07 19:42:00 UTC
[jira] [Updated] (FALCON-1174) Ability to disable oozie dryrun
while scheduling or updating the falcon entity
[ https://issues.apache.org/jira/browse/FALCON-1174?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Sowmya Ramesh updated FALCON-1174:
----------------------------------
Attachment: FALCON-1174.v0.patch
> Ability to disable oozie dryrun while scheduling or updating the falcon entity
> ------------------------------------------------------------------------------
>
> Key: FALCON-1174
> URL: https://issues.apache.org/jira/browse/FALCON-1174
> Project: Falcon
> Issue Type: Improvement
> Components: oozie
> Affects Versions: 0.6
> Reporter: Sowmya Ramesh
> Assignee: Sowmya Ramesh
> Fix For: 0.7
>
> Attachments: FALCON-1174.v0.patch
>
>
> Today, before scheduling or updating an entity Oozie dry run is done to validate it. This validation helps as Oozie dry run is s a sync operation and hence validation can be done before scheduling the job.
> There may be a requirement where user would want to turn off this feature. Improvement is to provide a config knob to skip the dry run.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)