You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "stack (JIRA)" <ji...@apache.org> on 2011/08/16 22:22:33 UTC

[jira] [Commented] (HBASE-4207) Run test suite in parallel, multiple concurrent test instances.

    [ https://issues.apache.org/jira/browse/HBASE-4207?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13085948#comment-13085948 ] 

stack commented on HBASE-4207:
------------------------------

Its doing some kinda weird pause every so often.  What I have attached seemed to run longer than serial running of tests.  Let me mess some more.

> Run test suite in parallel, multiple concurrent test instances.
> ---------------------------------------------------------------
>
>                 Key: HBASE-4207
>                 URL: https://issues.apache.org/jira/browse/HBASE-4207
>             Project: HBase
>          Issue Type: Task
>          Components: test
>            Reporter: stack
>         Attachments: parallel.build.txt
>
>
> From a suggestion by Lohit up on the list, surefire allows running unit tests in parallel.   I'm trying it.  I'll attach the patch to do classes in parallel (as opposed to methods) with four threads per core max.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira