You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@clerezza.apache.org by no...@apache.org on 2011/08/01 16:00:05 UTC

Incubator PMC/Board report for August 2011 (clerezza-dev@incubator.apache.org)

Dear Clerezza Developers,

This email was sent by an automated system on behalf of the Apache Incubator PMC.
It is an initial reminder to give you plenty of time to prepare your quarterly
board report.

The board meeting is scheduled for  Wed, 17 August 2011, 10 am Pacific. The report 
for your podling will form a part of the Incubator PMC report. The Incubator PMC 
requires your report to be submitted one week before the board meeting, to allow 
sufficient time for review.

Please submit your report with sufficient time to allow the incubator PMC, and 
subsequently board members to review and digest. Again, the very latest you 
should submit your report is one week prior to the board meeting.

Thanks,

The Apache Incubator PMC

Submitting your Report
----------------------

Your report should contain the following:

 * Your project name
 * A brief description of your project, which assumes no knowledge of the project
   or necessarily of its field
 * A list of the three most important issues to address in the move towards 
   graduation.
 * Any issues that the Incubator PMC or ASF Board might wish/need to be aware of
 * How has the community developed since the last report
 * How has the project developed since the last report.
 
This should be appended to the Incubator Wiki page at:

  http://wiki.apache.org/incubator/August2011

Note: This manually populated. You may need to wait a little before this page is
      created from a template.

Mentors
-------
Mentors should review reports for their project(s) and sign them off on the 
Incubator wiki page. Signing off reports shows that you are following the 
project - projects that are not signed may raise alarms for the Incubator PMC.

Incubator PMC


Re: Incubator PMC/Board report for August 2011 (clerezza-dev@incubator.apache.org)

Posted by Ross Gardler <rg...@opendirective.com>.
I've signed off - thanks to everyone nice and complete now.

Ross

On 10 August 2011 18:20, Hasan Hasan <ha...@trialox.org> wrote:
> done
> hasan
>
> On Wed, Aug 10, 2011 at 6:13 PM, Reto Bachmann-Gmür
> <me...@farewellutopia.com>wrote:
>
>> Hi Hasan
>>
>>
>> Could you merge it with the text at
>> http://wiki.apache.org/incubator/August2011? I put something a few
>> hours ago.
>>
>> Cheers,
>>
>> Reto
>>
>> On Wed, Aug 10, 2011 at 4:30 PM, Hasan Hasan <ha...@trialox.org> wrote:
>> > Dear All,
>> >
>> > Please find below some texts for the report. I would appreciate if
>> someone
>> > can proceed with the formal way of reporting this.
>> >
>> > --
>> > The most important achievements within this quarter are listed below:
>> > 1 The code has been improved to a stage ready for release. Procedure for
>> > releasing the code base has been initiated and within the release
>> activity
>> > it has been voted twice with positive results.
>> > 2 Daniel Spicar has contributed to the code base for quite some time and
>> the
>> > team could win him as a new committer.
>> > 3 Registration of Apache Clerezza for an evaluation through OSS Award (
>> > http://www.ossaward.ch/).
>> > --
>> >
>> > Cheers
>> > Hasan
>> >
>> >
>> > On Tue, Aug 9, 2011 at 6:33 PM, Reto Bachmann-Gmür <re...@apache.org>
>> wrote:
>> >
>> >> The board report on http://wiki.apache.org/incubator/August2011 is due
>> >> by tomorrow.
>> >>
>> >> I think this time we can report not only progress with respect to the
>> >> code base but also with respect to the community (arguments, process
>> >> specification, new member, relase). Anyone feels like describing this?
>> >>
>> >> Cheers,
>> >> Reto
>> >>
>> >> On Mon, Aug 1, 2011 at 4:00 PM,  <no...@apache.org> wrote:
>> >> > Dear Clerezza Developers,
>> >> >
>> >> > This email was sent by an automated system on behalf of the Apache
>> >> Incubator PMC.
>> >> > It is an initial reminder to give you plenty of time to prepare your
>> >> quarterly
>> >> > board report.
>> >> >
>> >> > The board meeting is scheduled for  Wed, 17 August 2011, 10 am
>> Pacific.
>> >> The report
>> >> > for your podling will form a part of the Incubator PMC report. The
>> >> Incubator PMC
>> >> > requires your report to be submitted one week before the board
>> meeting,
>> >> to allow
>> >> > sufficient time for review.
>> >> >
>> >> > Please submit your report with sufficient time to allow the incubator
>> >> PMC, and
>> >> > subsequently board members to review and digest. Again, the very
>> latest
>> >> you
>> >> > should submit your report is one week prior to the board meeting.
>> >> >
>> >> > Thanks,
>> >> >
>> >> > The Apache Incubator PMC
>> >> >
>> >> > Submitting your Report
>> >> > ----------------------
>> >> >
>> >> > Your report should contain the following:
>> >> >
>> >> >  * Your project name
>> >> >  * A brief description of your project, which assumes no knowledge of
>> the
>> >> project
>> >> >   or necessarily of its field
>> >> >  * A list of the three most important issues to address in the move
>> >> towards
>> >> >   graduation.
>> >> >  * Any issues that the Incubator PMC or ASF Board might wish/need to
>> be
>> >> aware of
>> >> >  * How has the community developed since the last report
>> >> >  * How has the project developed since the last report.
>> >> >
>> >> > This should be appended to the Incubator Wiki page at:
>> >> >
>> >> >  http://wiki.apache.org/incubator/August2011
>> >> >
>> >> > Note: This manually populated. You may need to wait a little before
>> this
>> >> page is
>> >> >      created from a template.
>> >> >
>> >> > Mentors
>> >> > -------
>> >> > Mentors should review reports for their project(s) and sign them off
>> on
>> >> the
>> >> > Incubator wiki page. Signing off reports shows that you are following
>> the
>> >> > project - projects that are not signed may raise alarms for the
>> Incubator
>> >> PMC.
>> >> >
>> >> > Incubator PMC
>> >> >
>> >> >
>> >>
>> >
>>
>



-- 
Ross Gardler (@rgardler)
Programme Leader (Open Development)
OpenDirective http://opendirective.com

Re: Incubator PMC/Board report for August 2011 (clerezza-dev@incubator.apache.org)

Posted by Hasan Hasan <ha...@trialox.org>.
done
hasan

On Wed, Aug 10, 2011 at 6:13 PM, Reto Bachmann-Gmür
<me...@farewellutopia.com>wrote:

> Hi Hasan
>
>
> Could you merge it with the text at
> http://wiki.apache.org/incubator/August2011? I put something a few
> hours ago.
>
> Cheers,
>
> Reto
>
> On Wed, Aug 10, 2011 at 4:30 PM, Hasan Hasan <ha...@trialox.org> wrote:
> > Dear All,
> >
> > Please find below some texts for the report. I would appreciate if
> someone
> > can proceed with the formal way of reporting this.
> >
> > --
> > The most important achievements within this quarter are listed below:
> > 1 The code has been improved to a stage ready for release. Procedure for
> > releasing the code base has been initiated and within the release
> activity
> > it has been voted twice with positive results.
> > 2 Daniel Spicar has contributed to the code base for quite some time and
> the
> > team could win him as a new committer.
> > 3 Registration of Apache Clerezza for an evaluation through OSS Award (
> > http://www.ossaward.ch/).
> > --
> >
> > Cheers
> > Hasan
> >
> >
> > On Tue, Aug 9, 2011 at 6:33 PM, Reto Bachmann-Gmür <re...@apache.org>
> wrote:
> >
> >> The board report on http://wiki.apache.org/incubator/August2011 is due
> >> by tomorrow.
> >>
> >> I think this time we can report not only progress with respect to the
> >> code base but also with respect to the community (arguments, process
> >> specification, new member, relase). Anyone feels like describing this?
> >>
> >> Cheers,
> >> Reto
> >>
> >> On Mon, Aug 1, 2011 at 4:00 PM,  <no...@apache.org> wrote:
> >> > Dear Clerezza Developers,
> >> >
> >> > This email was sent by an automated system on behalf of the Apache
> >> Incubator PMC.
> >> > It is an initial reminder to give you plenty of time to prepare your
> >> quarterly
> >> > board report.
> >> >
> >> > The board meeting is scheduled for  Wed, 17 August 2011, 10 am
> Pacific.
> >> The report
> >> > for your podling will form a part of the Incubator PMC report. The
> >> Incubator PMC
> >> > requires your report to be submitted one week before the board
> meeting,
> >> to allow
> >> > sufficient time for review.
> >> >
> >> > Please submit your report with sufficient time to allow the incubator
> >> PMC, and
> >> > subsequently board members to review and digest. Again, the very
> latest
> >> you
> >> > should submit your report is one week prior to the board meeting.
> >> >
> >> > Thanks,
> >> >
> >> > The Apache Incubator PMC
> >> >
> >> > Submitting your Report
> >> > ----------------------
> >> >
> >> > Your report should contain the following:
> >> >
> >> >  * Your project name
> >> >  * A brief description of your project, which assumes no knowledge of
> the
> >> project
> >> >   or necessarily of its field
> >> >  * A list of the three most important issues to address in the move
> >> towards
> >> >   graduation.
> >> >  * Any issues that the Incubator PMC or ASF Board might wish/need to
> be
> >> aware of
> >> >  * How has the community developed since the last report
> >> >  * How has the project developed since the last report.
> >> >
> >> > This should be appended to the Incubator Wiki page at:
> >> >
> >> >  http://wiki.apache.org/incubator/August2011
> >> >
> >> > Note: This manually populated. You may need to wait a little before
> this
> >> page is
> >> >      created from a template.
> >> >
> >> > Mentors
> >> > -------
> >> > Mentors should review reports for their project(s) and sign them off
> on
> >> the
> >> > Incubator wiki page. Signing off reports shows that you are following
> the
> >> > project - projects that are not signed may raise alarms for the
> Incubator
> >> PMC.
> >> >
> >> > Incubator PMC
> >> >
> >> >
> >>
> >
>

Re: Incubator PMC/Board report for August 2011 (clerezza-dev@incubator.apache.org)

Posted by Reto Bachmann-Gmür <me...@farewellutopia.com>.
Hi Hasan


Could you merge it with the text at
http://wiki.apache.org/incubator/August2011? I put something a few
hours ago.

Cheers,

Reto

On Wed, Aug 10, 2011 at 4:30 PM, Hasan Hasan <ha...@trialox.org> wrote:
> Dear All,
>
> Please find below some texts for the report. I would appreciate if someone
> can proceed with the formal way of reporting this.
>
> --
> The most important achievements within this quarter are listed below:
> 1 The code has been improved to a stage ready for release. Procedure for
> releasing the code base has been initiated and within the release activity
> it has been voted twice with positive results.
> 2 Daniel Spicar has contributed to the code base for quite some time and the
> team could win him as a new committer.
> 3 Registration of Apache Clerezza for an evaluation through OSS Award (
> http://www.ossaward.ch/).
> --
>
> Cheers
> Hasan
>
>
> On Tue, Aug 9, 2011 at 6:33 PM, Reto Bachmann-Gmür <re...@apache.org> wrote:
>
>> The board report on http://wiki.apache.org/incubator/August2011 is due
>> by tomorrow.
>>
>> I think this time we can report not only progress with respect to the
>> code base but also with respect to the community (arguments, process
>> specification, new member, relase). Anyone feels like describing this?
>>
>> Cheers,
>> Reto
>>
>> On Mon, Aug 1, 2011 at 4:00 PM,  <no...@apache.org> wrote:
>> > Dear Clerezza Developers,
>> >
>> > This email was sent by an automated system on behalf of the Apache
>> Incubator PMC.
>> > It is an initial reminder to give you plenty of time to prepare your
>> quarterly
>> > board report.
>> >
>> > The board meeting is scheduled for  Wed, 17 August 2011, 10 am Pacific.
>> The report
>> > for your podling will form a part of the Incubator PMC report. The
>> Incubator PMC
>> > requires your report to be submitted one week before the board meeting,
>> to allow
>> > sufficient time for review.
>> >
>> > Please submit your report with sufficient time to allow the incubator
>> PMC, and
>> > subsequently board members to review and digest. Again, the very latest
>> you
>> > should submit your report is one week prior to the board meeting.
>> >
>> > Thanks,
>> >
>> > The Apache Incubator PMC
>> >
>> > Submitting your Report
>> > ----------------------
>> >
>> > Your report should contain the following:
>> >
>> >  * Your project name
>> >  * A brief description of your project, which assumes no knowledge of the
>> project
>> >   or necessarily of its field
>> >  * A list of the three most important issues to address in the move
>> towards
>> >   graduation.
>> >  * Any issues that the Incubator PMC or ASF Board might wish/need to be
>> aware of
>> >  * How has the community developed since the last report
>> >  * How has the project developed since the last report.
>> >
>> > This should be appended to the Incubator Wiki page at:
>> >
>> >  http://wiki.apache.org/incubator/August2011
>> >
>> > Note: This manually populated. You may need to wait a little before this
>> page is
>> >      created from a template.
>> >
>> > Mentors
>> > -------
>> > Mentors should review reports for their project(s) and sign them off on
>> the
>> > Incubator wiki page. Signing off reports shows that you are following the
>> > project - projects that are not signed may raise alarms for the Incubator
>> PMC.
>> >
>> > Incubator PMC
>> >
>> >
>>
>

Re: Incubator PMC/Board report for August 2011 (clerezza-dev@incubator.apache.org)

Posted by Ross Gardler <rg...@opendirective.com>.
Please see the description of what is required in a status report at
http://incubator.apache.org/guides/ppmc.html

This report is incomplete in its current form - most importantly in
acknowledging and planning for required steps to move towards
graduation.

Thanks
Ross

On 10 August 2011 15:30, Hasan Hasan <ha...@trialox.org> wrote:
> Dear All,
>
> Please find below some texts for the report. I would appreciate if someone
> can proceed with the formal way of reporting this.
>
> --
> The most important achievements within this quarter are listed below:
> 1 The code has been improved to a stage ready for release. Procedure for
> releasing the code base has been initiated and within the release activity
> it has been voted twice with positive results.
> 2 Daniel Spicar has contributed to the code base for quite some time and the
> team could win him as a new committer.
> 3 Registration of Apache Clerezza for an evaluation through OSS Award (
> http://www.ossaward.ch/).
> --
>
> Cheers
> Hasan
>
>
> On Tue, Aug 9, 2011 at 6:33 PM, Reto Bachmann-Gmür <re...@apache.org> wrote:
>
>> The board report on http://wiki.apache.org/incubator/August2011 is due
>> by tomorrow.
>>
>> I think this time we can report not only progress with respect to the
>> code base but also with respect to the community (arguments, process
>> specification, new member, relase). Anyone feels like describing this?
>>
>> Cheers,
>> Reto
>>
>> On Mon, Aug 1, 2011 at 4:00 PM,  <no...@apache.org> wrote:
>> > Dear Clerezza Developers,
>> >
>> > This email was sent by an automated system on behalf of the Apache
>> Incubator PMC.
>> > It is an initial reminder to give you plenty of time to prepare your
>> quarterly
>> > board report.
>> >
>> > The board meeting is scheduled for  Wed, 17 August 2011, 10 am Pacific.
>> The report
>> > for your podling will form a part of the Incubator PMC report. The
>> Incubator PMC
>> > requires your report to be submitted one week before the board meeting,
>> to allow
>> > sufficient time for review.
>> >
>> > Please submit your report with sufficient time to allow the incubator
>> PMC, and
>> > subsequently board members to review and digest. Again, the very latest
>> you
>> > should submit your report is one week prior to the board meeting.
>> >
>> > Thanks,
>> >
>> > The Apache Incubator PMC
>> >
>> > Submitting your Report
>> > ----------------------
>> >
>> > Your report should contain the following:
>> >
>> >  * Your project name
>> >  * A brief description of your project, which assumes no knowledge of the
>> project
>> >   or necessarily of its field
>> >  * A list of the three most important issues to address in the move
>> towards
>> >   graduation.
>> >  * Any issues that the Incubator PMC or ASF Board might wish/need to be
>> aware of
>> >  * How has the community developed since the last report
>> >  * How has the project developed since the last report.
>> >
>> > This should be appended to the Incubator Wiki page at:
>> >
>> >  http://wiki.apache.org/incubator/August2011
>> >
>> > Note: This manually populated. You may need to wait a little before this
>> page is
>> >      created from a template.
>> >
>> > Mentors
>> > -------
>> > Mentors should review reports for their project(s) and sign them off on
>> the
>> > Incubator wiki page. Signing off reports shows that you are following the
>> > project - projects that are not signed may raise alarms for the Incubator
>> PMC.
>> >
>> > Incubator PMC
>> >
>> >
>>
>



-- 
Ross Gardler (@rgardler)
Programme Leader (Open Development)
OpenDirective http://opendirective.com

Re: Incubator PMC/Board report for August 2011 (clerezza-dev@incubator.apache.org)

Posted by Hasan Hasan <ha...@trialox.org>.
Dear All,

Please find below some texts for the report. I would appreciate if someone
can proceed with the formal way of reporting this.

--
The most important achievements within this quarter are listed below:
1 The code has been improved to a stage ready for release. Procedure for
releasing the code base has been initiated and within the release activity
it has been voted twice with positive results.
2 Daniel Spicar has contributed to the code base for quite some time and the
team could win him as a new committer.
3 Registration of Apache Clerezza for an evaluation through OSS Award (
http://www.ossaward.ch/).
--

Cheers
Hasan


On Tue, Aug 9, 2011 at 6:33 PM, Reto Bachmann-Gmür <re...@apache.org> wrote:

> The board report on http://wiki.apache.org/incubator/August2011 is due
> by tomorrow.
>
> I think this time we can report not only progress with respect to the
> code base but also with respect to the community (arguments, process
> specification, new member, relase). Anyone feels like describing this?
>
> Cheers,
> Reto
>
> On Mon, Aug 1, 2011 at 4:00 PM,  <no...@apache.org> wrote:
> > Dear Clerezza Developers,
> >
> > This email was sent by an automated system on behalf of the Apache
> Incubator PMC.
> > It is an initial reminder to give you plenty of time to prepare your
> quarterly
> > board report.
> >
> > The board meeting is scheduled for  Wed, 17 August 2011, 10 am Pacific.
> The report
> > for your podling will form a part of the Incubator PMC report. The
> Incubator PMC
> > requires your report to be submitted one week before the board meeting,
> to allow
> > sufficient time for review.
> >
> > Please submit your report with sufficient time to allow the incubator
> PMC, and
> > subsequently board members to review and digest. Again, the very latest
> you
> > should submit your report is one week prior to the board meeting.
> >
> > Thanks,
> >
> > The Apache Incubator PMC
> >
> > Submitting your Report
> > ----------------------
> >
> > Your report should contain the following:
> >
> >  * Your project name
> >  * A brief description of your project, which assumes no knowledge of the
> project
> >   or necessarily of its field
> >  * A list of the three most important issues to address in the move
> towards
> >   graduation.
> >  * Any issues that the Incubator PMC or ASF Board might wish/need to be
> aware of
> >  * How has the community developed since the last report
> >  * How has the project developed since the last report.
> >
> > This should be appended to the Incubator Wiki page at:
> >
> >  http://wiki.apache.org/incubator/August2011
> >
> > Note: This manually populated. You may need to wait a little before this
> page is
> >      created from a template.
> >
> > Mentors
> > -------
> > Mentors should review reports for their project(s) and sign them off on
> the
> > Incubator wiki page. Signing off reports shows that you are following the
> > project - projects that are not signed may raise alarms for the Incubator
> PMC.
> >
> > Incubator PMC
> >
> >
>

Re: Incubator PMC/Board report for August 2011 (clerezza-dev@incubator.apache.org)

Posted by Reto Bachmann-Gmür <re...@apache.org>.
The board report on http://wiki.apache.org/incubator/August2011 is due
by tomorrow.

I think this time we can report not only progress with respect to the
code base but also with respect to the community (arguments, process
specification, new member, relase). Anyone feels like describing this?

Cheers,
Reto

On Mon, Aug 1, 2011 at 4:00 PM,  <no...@apache.org> wrote:
> Dear Clerezza Developers,
>
> This email was sent by an automated system on behalf of the Apache Incubator PMC.
> It is an initial reminder to give you plenty of time to prepare your quarterly
> board report.
>
> The board meeting is scheduled for  Wed, 17 August 2011, 10 am Pacific. The report
> for your podling will form a part of the Incubator PMC report. The Incubator PMC
> requires your report to be submitted one week before the board meeting, to allow
> sufficient time for review.
>
> Please submit your report with sufficient time to allow the incubator PMC, and
> subsequently board members to review and digest. Again, the very latest you
> should submit your report is one week prior to the board meeting.
>
> Thanks,
>
> The Apache Incubator PMC
>
> Submitting your Report
> ----------------------
>
> Your report should contain the following:
>
>  * Your project name
>  * A brief description of your project, which assumes no knowledge of the project
>   or necessarily of its field
>  * A list of the three most important issues to address in the move towards
>   graduation.
>  * Any issues that the Incubator PMC or ASF Board might wish/need to be aware of
>  * How has the community developed since the last report
>  * How has the project developed since the last report.
>
> This should be appended to the Incubator Wiki page at:
>
>  http://wiki.apache.org/incubator/August2011
>
> Note: This manually populated. You may need to wait a little before this page is
>      created from a template.
>
> Mentors
> -------
> Mentors should review reports for their project(s) and sign them off on the
> Incubator wiki page. Signing off reports shows that you are following the
> project - projects that are not signed may raise alarms for the Incubator PMC.
>
> Incubator PMC
>
>