You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "nabarun (JIRA)" <ji...@apache.org> on 2018/10/03 21:38:35 UTC
[jira] [Closed] (GEODE-4803) CI: ConcurrentDeployDUnitTest fails
intermittently
[ https://issues.apache.org/jira/browse/GEODE-4803?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
nabarun closed GEODE-4803.
--------------------------
> CI: ConcurrentDeployDUnitTest fails intermittently
> --------------------------------------------------
>
> Key: GEODE-4803
> URL: https://issues.apache.org/jira/browse/GEODE-4803
> Project: Geode
> Issue Type: Bug
> Components: gfsh
> Affects Versions: 1.5.0
> Reporter: Kenneth Howe
> Assignee: Jinmei Liao
> Priority: Major
> Labels: ci, pull-request-available, swat
> Fix For: 1.7.0
>
> Attachments: Test results - Class org.apache.geode.management.internal.cli.commands.ConcurrentDeployDUnitTest.html
>
> Time Spent: 40m
> Remaining Estimate: 0h
>
> The test concurrently runs iterations of gfsh commands to deploy and undeploy .jar's from 3 gfsh clients to the same server, then waits up to 5 minutes for the gfsh clients to finish. Sometimes in the CI pipelines one or more of the clients don't complete their iterations within the 5 minute wait.
> Test timing and/or client iterations needs to be adjusted for variations in machine and network speed.
> Also see GEODE-800.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)