You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@camel.apache.org by "Otavio Rodolfo Piske (Jira)" <ji...@apache.org> on 2024/10/03 13:36:00 UTC

[jira] [Created] (CAMEL-21313) camel-clickup: the tests are inadequately written and inconsistent

Otavio Rodolfo Piske created CAMEL-21313:
--------------------------------------------

             Summary: camel-clickup: the tests are inadequately written and inconsistent
                 Key: CAMEL-21313
                 URL: https://issues.apache.org/jira/browse/CAMEL-21313
             Project: Camel
          Issue Type: Test
          Components: camel-clickup
    Affects Versions: 4.9.0
            Reporter: Otavio Rodolfo Piske


The tests do too much. Ideally, each test should test one thing and only one.

The actual test code should NOT: 

1. Setup the environment, routes or the test itself
2. Manage the context lifecycle (unless the context lifecycle is primarily relevant to the test itself)
3. Should not isolate the test in an anonymous code block 

Ideally, the test should do one thing and one thing only: assert that the condition under test pass or fail. Everything else is either setup, cleanup or management and should not be in the test method.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)