You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@cayenne.apache.org by "Nikita Timofeev (JIRA)" <ji...@apache.org> on 2017/07/25 13:03:00 UTC

[jira] [Closed] (CAY-2152) Redesign project file upgrade system

     [ https://issues.apache.org/jira/browse/CAY-2152?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Nikita Timofeev closed CAY-2152.
--------------------------------
       Resolution: Fixed
         Assignee: Nikita Timofeev
    Fix Version/s: 4.1.M1

Fixed as part of new project XML handling per commit https://github.com/apache/cayenne/commit/38553b1603b9622a6eae691131a4106591649556

No project backup performed.

> Redesign project file upgrade system
> ------------------------------------
>
>                 Key: CAY-2152
>                 URL: https://issues.apache.org/jira/browse/CAY-2152
>             Project: Cayenne
>          Issue Type: Improvement
>          Components: Modeler
>            Reporter: Nikita Timofeev
>            Assignee: Nikita Timofeev
>             Fix For: 4.1.M1
>
>
> Current project file version upgrade system is relying on loading and saving whole project structure with all entities in it.
> With this strategy upgrader can easily become unstable as it can not deal with future changes.
> To tolerate any past and future changes (especially incompatible one) project upgrader should operate only with xml structure.
> To implement this several problems should be kept in mind:
> - new loader and/or saver should be implemented which can operate directly with xml data
> - old upgrade logic should be reimplemented with new design
> - probably project files backups should be done prior upgrade



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)