[jira] [Resolved] (FLINK-12131) Resetting ExecutionVertex in region failover may cause inconsistency of IntermediateResult status

     [ https://issues.apache.org/jira/browse/FLINK-12131?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Till Rohrmann resolved FLINK-12131.
-----------------------------------
       Resolution: Fixed
    Fix Version/s: 1.9.0

Fixed via c6600280a5896f9f9e122dd533a5c515423e69d3

> Resetting ExecutionVertex in region failover may cause inconsistency of IntermediateResult status
> -------------------------------------------------------------------------------------------------
>
>                 Key: FLINK-12131
>                 URL: https://issues.apache.org/jira/browse/FLINK-12131
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Runtime / Coordination
>    Affects Versions: 1.9.0
>            Reporter: Zhu Zhu
>            Assignee: Zhu Zhu
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 1.9.0
>
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> Two status may not be correct with region failover and current reset logic.
>  # *numberOfRunningProducers* in *IntermediateResult*.
>  # *hasDataProduced* in *IntermediateResultPartition*.
> This is because currently only when the *ExecutionJobVertex* is reset will the related *IntermediateResult*(and the inner *IntermediateResultPartition*) get reset. But region failover only resets the affected *ExecutionVertex*(es),  rather than the entire *ExecutionJobVertex*, leaving the status listed above in an inconsistent state.
> Problems below may occur as a result:
>  # when a FINISHED vertex is restarted and finishes again, the *IntermediateResult.numberOfRunningProducers* may drop below 0 and throws exception to trigger global failover
>  # the *IntermediateResult.numberOfRunningProducers* can be smaller than fact, letting the downstream vertices scheduled earlier than expected
>  # the *IntermediateResultPartition* is reset and not started yet but the *hasDataProduced* remains true
> That's why I'd propose we add IntermediateResult status adjust logic to *ExecutionVertex.**resetForNewExecution()***.
> Detailed design: [https://docs.google.com/document/d/1YA3k8rwDEv1UdaV9NwoDmwc-XorG__JUXlpyJtDs4Ss/edit?usp=sharing] 



--