Posted to dev@harmony.apache.org by Sian January <si...@googlemail.com> on 2008/10/21 14:09:49 UTC

[milestone8] Time for M8?

Hi everyone,

I think M8 is due at the end of October if we're sticking to 3-monthly
milestones.

Shall we freeze next Monday with a view to declaring M8 next Friday
(31st)?  Is this going to cause problems for anyone involved in active
development?

Thanks,

Sian


-- 
Unless stated otherwise above:
IBM United Kingdom Limited - Registered in England and Wales with number 741598.
Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU

Re: [milestone8] Time for M8?

Posted by Sean Qiu <se...@gmail.com>.
+1

2008/10/27 Sian January <si...@googlemail.com>

> Ok - thanks Chunrong.
>
> Looking at our website[1], I think we did agree at some point to do a
> week's feature freeze followed by a week's code freeze, so I'm
> inclined to go with that unless anyone has any objections.
>
> That would mean starting a feature freeze later today, then a code
> freeze next Monday with a view to releasing the milestone on Friday
> 7th November.  It does mean we won't have the milestone out in time
> for ApacheCon US though, so if anyone feels strongly about this please
> say now.
>
> [1] http://harmony.apache.org/subcomponents/buildtest/index.html -
> "Before a release date there is 1 week feature freeze period and 1
> week code freeze period".
>
> 2008/10/26 chunrong lai <ch...@gmail.com>:
> > I myself thought next Monday is the "feature freeze" day when is about a
> > week earlier than the full code freeze. Sorry for the confusion. I would
> > just like to have some features and bug fixed before next year.
> >
> > On Fri, Oct 24, 2008 at 6:28 PM, Sian January <
> sianjanuary@googlemail.com>wrote:
> >
> >> Chunrong - just to clarify, I was suggesting a full code freeze from
> >> next Monday (i.e. only essential commits that are approved by at least
> >> two committers).  Is that what your +1 is for?
> >>
> >> Thanks,
> >>
> >> Sian
> >>
> >> 2008/10/24 chunrong lai <ch...@gmail.com>:
> >>  >  +1.
> >> >  I have not development plan in hand.
> >> >  But I want to check some issues, include those from ehwa-api and
> >> > concurrent tests.
> >> >  I also think that some JIRA patches can be reviewed and committed
> before
> >> > M8.
> >> >
> >> >   Thanks.
> >> >
> >> >
> >> >
> >> > On Wed, Oct 22, 2008 at 5:58 PM, Sian January <
> >> sianjanuary@googlemail.com>wrote:
> >> >
> >> >> Oops - I'll see if I can update that today...
> >> >>
> >> >> 2008/10/22 Jack Cai <gr...@gmail.com>:
> >> >>  > Thanks Sian!
> >> >> >
> >> >> > Guess we need to update our home page News part to add M7 there...
> It
> >> >> still
> >> >> > says M6 as the latest stable build.
> >> >> >
> >> >> > -Jack
> >> >> >
> >> >> > 2008/10/21 Tim Ellison <t....@gmail.com>
> >> >> >
> >> >> >> Sian January wrote:
> >> >> >> > I think M8 is due at the end of October if we're sticking to
> >> 3-monthly
> >> >> >> > milestones.
> >> >> >> >
> >> >> >> > Shall we freeze next Monday with a view to declaring M8 next
> Friday
> >> >> >> > (31st)?  Is this going to cause problems for anyone involved in
> >> active
> >> >> >> > development?
> >> >> >>
> >> >> >> Sounds good to me.  Hopefully we can get M8 out in time for
> >> ApacheConUS.
> >> >> >>
> >> >> >> Regards,
> >> >> >> Tim
> >> >> >>
> >> >> >
> >> >>
> >> >>
> >> >>
> >> >>  --
> >> >> Unless stated otherwise above:
> >> >> IBM United Kingdom Limited - Registered in England and Wales with
> number
> >> >> 741598.
> >> >> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire
> PO6
> >> 3AU
> >> >>
> >> >
> >>
> >>
> >>
> >> --
> >>  Unless stated otherwise above:
> >> IBM United Kingdom Limited - Registered in England and Wales with number
> >> 741598.
> >> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6
> 3AU
> >>
> >
>
>
>
> --
> Unless stated otherwise above:
> IBM United Kingdom Limited - Registered in England and Wales with number
> 741598.
> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU
>



-- 
Best Regards
Sean, Xiao Xia Qiu

China Software Development Lab, IBM

Re: [milestone8] Time for M8?

Posted by Tim Ellison <t....@gmail.com>.
+1   Fri is still ApacheCon -- just :-)

Tim

Sian January wrote:
> Ok - thanks Chunrong.
> 
> Looking at our website[1], I think we did agree at some point to do a
> week's feature freeze followed by a week's code freeze, so I'm
> inclined to go with that unless anyone has any objections.
> 
> That would mean starting a feature freeze later today, then a code
> freeze next Monday with a view to releasing the milestone on Friday
> 7th November.  It does mean we won't have the milestone out in time
> for ApacheCon US though, so if anyone feels strongly about this please
> say now.
> 
> [1] http://harmony.apache.org/subcomponents/buildtest/index.html -
> "Before a release date there is 1 week feature freeze period and 1
> week code freeze period".
> 
> 2008/10/26 chunrong lai <ch...@gmail.com>:
>> I myself thought next Monday is the "feature freeze" day when is about a
>> week earlier than the full code freeze. Sorry for the confusion. I would
>> just like to have some features and bug fixed before next year.
>>
>> On Fri, Oct 24, 2008 at 6:28 PM, Sian January <si...@googlemail.com>wrote:
>>
>>> Chunrong - just to clarify, I was suggesting a full code freeze from
>>> next Monday (i.e. only essential commits that are approved by at least
>>> two committers).  Is that what your +1 is for?
>>>
>>> Thanks,
>>>
>>> Sian
>>>
>>> 2008/10/24 chunrong lai <ch...@gmail.com>:
>>>  >  +1.
>>>>  I have not development plan in hand.
>>>>  But I want to check some issues, include those from ehwa-api and
>>>> concurrent tests.
>>>>  I also think that some JIRA patches can be reviewed and committed before
>>>> M8.
>>>>
>>>>   Thanks.
>>>>
>>>>
>>>>
>>>> On Wed, Oct 22, 2008 at 5:58 PM, Sian January <
>>> sianjanuary@googlemail.com>wrote:
>>>>> Oops - I'll see if I can update that today...
>>>>>
>>>>> 2008/10/22 Jack Cai <gr...@gmail.com>:
>>>>>  > Thanks Sian!
>>>>>> Guess we need to update our home page News part to add M7 there... It
>>>>> still
>>>>>> says M6 as the latest stable build.
>>>>>>
>>>>>> -Jack
>>>>>>
>>>>>> 2008/10/21 Tim Ellison <t....@gmail.com>
>>>>>>
>>>>>>> Sian January wrote:
>>>>>>>> I think M8 is due at the end of October if we're sticking to
>>> 3-monthly
>>>>>>>> milestones.
>>>>>>>>
>>>>>>>> Shall we freeze next Monday with a view to declaring M8 next Friday
>>>>>>>> (31st)?  Is this going to cause problems for anyone involved in
>>> active
>>>>>>>> development?
>>>>>>> Sounds good to me.  Hopefully we can get M8 out in time for
>>> ApacheConUS.
>>>>>>> Regards,
>>>>>>> Tim
>>>>>>>
>>>>>
>>>>>
>>>>>  --
>>>>> Unless stated otherwise above:
>>>>> IBM United Kingdom Limited - Registered in England and Wales with number
>>>>> 741598.
>>>>> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6
>>> 3AU
>>>
>>>
>>> --
>>>  Unless stated otherwise above:
>>> IBM United Kingdom Limited - Registered in England and Wales with number
>>> 741598.
>>> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU
>>>
> 
> 
> 

Re: [milestone8] Time for M8?

Posted by Sian January <si...@googlemail.com>.
Ok - thanks Chunrong.

Looking at our website[1], I think we did agree at some point to do a
week's feature freeze followed by a week's code freeze, so I'm
inclined to go with that unless anyone has any objections.

That would mean starting a feature freeze later today, then a code
freeze next Monday with a view to releasing the milestone on Friday
7th November.  It does mean we won't have the milestone out in time
for ApacheCon US though, so if anyone feels strongly about this please
say now.

[1] http://harmony.apache.org/subcomponents/buildtest/index.html -
"Before a release date there is 1 week feature freeze period and 1
week code freeze period".

2008/10/26 chunrong lai <ch...@gmail.com>:
> I myself thought next Monday is the "feature freeze" day when is about a
> week earlier than the full code freeze. Sorry for the confusion. I would
> just like to have some features and bug fixed before next year.
>
> On Fri, Oct 24, 2008 at 6:28 PM, Sian January <si...@googlemail.com>wrote:
>
>> Chunrong - just to clarify, I was suggesting a full code freeze from
>> next Monday (i.e. only essential commits that are approved by at least
>> two committers).  Is that what your +1 is for?
>>
>> Thanks,
>>
>> Sian
>>
>> 2008/10/24 chunrong lai <ch...@gmail.com>:
>>  >  +1.
>> >  I have not development plan in hand.
>> >  But I want to check some issues, include those from ehwa-api and
>> > concurrent tests.
>> >  I also think that some JIRA patches can be reviewed and committed before
>> > M8.
>> >
>> >   Thanks.
>> >
>> >
>> >
>> > On Wed, Oct 22, 2008 at 5:58 PM, Sian January <
>> sianjanuary@googlemail.com>wrote:
>> >
>> >> Oops - I'll see if I can update that today...
>> >>
>> >> 2008/10/22 Jack Cai <gr...@gmail.com>:
>> >>  > Thanks Sian!
>> >> >
>> >> > Guess we need to update our home page News part to add M7 there... It
>> >> still
>> >> > says M6 as the latest stable build.
>> >> >
>> >> > -Jack
>> >> >
>> >> > 2008/10/21 Tim Ellison <t....@gmail.com>
>> >> >
>> >> >> Sian January wrote:
>> >> >> > I think M8 is due at the end of October if we're sticking to
>> 3-monthly
>> >> >> > milestones.
>> >> >> >
>> >> >> > Shall we freeze next Monday with a view to declaring M8 next Friday
>> >> >> > (31st)?  Is this going to cause problems for anyone involved in
>> active
>> >> >> > development?
>> >> >>
>> >> >> Sounds good to me.  Hopefully we can get M8 out in time for
>> ApacheConUS.
>> >> >>
>> >> >> Regards,
>> >> >> Tim
>> >> >>
>> >> >
>> >>
>> >>
>> >>
>> >>  --
>> >> Unless stated otherwise above:
>> >> IBM United Kingdom Limited - Registered in England and Wales with number
>> >> 741598.
>> >> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6
>> 3AU
>> >>
>> >
>>
>>
>>
>> --
>>  Unless stated otherwise above:
>> IBM United Kingdom Limited - Registered in England and Wales with number
>> 741598.
>> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU
>>
>



-- 
Unless stated otherwise above:
IBM United Kingdom Limited - Registered in England and Wales with number 741598.
Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU

Re: [milestone8] Time for M8?

Posted by chunrong lai <ch...@gmail.com>.
I myself thought next Monday is the "feature freeze" day when is about a
week earlier than the full code freeze. Sorry for the confusion. I would
just like to have some features and bug fixed before next year.

On Fri, Oct 24, 2008 at 6:28 PM, Sian January <si...@googlemail.com>wrote:

> Chunrong - just to clarify, I was suggesting a full code freeze from
> next Monday (i.e. only essential commits that are approved by at least
> two committers).  Is that what your +1 is for?
>
> Thanks,
>
> Sian
>
> 2008/10/24 chunrong lai <ch...@gmail.com>:
>  >  +1.
> >  I have not development plan in hand.
> >  But I want to check some issues, include those from ehwa-api and
> > concurrent tests.
> >  I also think that some JIRA patches can be reviewed and committed before
> > M8.
> >
> >   Thanks.
> >
> >
> >
> > On Wed, Oct 22, 2008 at 5:58 PM, Sian January <
> sianjanuary@googlemail.com>wrote:
> >
> >> Oops - I'll see if I can update that today...
> >>
> >> 2008/10/22 Jack Cai <gr...@gmail.com>:
> >>  > Thanks Sian!
> >> >
> >> > Guess we need to update our home page News part to add M7 there... It
> >> still
> >> > says M6 as the latest stable build.
> >> >
> >> > -Jack
> >> >
> >> > 2008/10/21 Tim Ellison <t....@gmail.com>
> >> >
> >> >> Sian January wrote:
> >> >> > I think M8 is due at the end of October if we're sticking to
> 3-monthly
> >> >> > milestones.
> >> >> >
> >> >> > Shall we freeze next Monday with a view to declaring M8 next Friday
> >> >> > (31st)?  Is this going to cause problems for anyone involved in
> active
> >> >> > development?
> >> >>
> >> >> Sounds good to me.  Hopefully we can get M8 out in time for
> ApacheConUS.
> >> >>
> >> >> Regards,
> >> >> Tim
> >> >>
> >> >
> >>
> >>
> >>
> >>  --
> >> Unless stated otherwise above:
> >> IBM United Kingdom Limited - Registered in England and Wales with number
> >> 741598.
> >> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6
> 3AU
> >>
> >
>
>
>
> --
>  Unless stated otherwise above:
> IBM United Kingdom Limited - Registered in England and Wales with number
> 741598.
> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU
>

Re: [milestone8] Time for M8?

Posted by Sian January <si...@googlemail.com>.
Chunrong - just to clarify, I was suggesting a full code freeze from
next Monday (i.e. only essential commits that are approved by at least
two committers).  Is that what your +1 is for?

Thanks,

Sian

2008/10/24 chunrong lai <ch...@gmail.com>:
>  +1.
>  I have not development plan in hand.
>  But I want to check some issues, include those from ehwa-api and
> concurrent tests.
>  I also think that some JIRA patches can be reviewed and committed before
> M8.
>
>   Thanks.
>
>
>
> On Wed, Oct 22, 2008 at 5:58 PM, Sian January <si...@googlemail.com>wrote:
>
>> Oops - I'll see if I can update that today...
>>
>> 2008/10/22 Jack Cai <gr...@gmail.com>:
>>  > Thanks Sian!
>> >
>> > Guess we need to update our home page News part to add M7 there... It
>> still
>> > says M6 as the latest stable build.
>> >
>> > -Jack
>> >
>> > 2008/10/21 Tim Ellison <t....@gmail.com>
>> >
>> >> Sian January wrote:
>> >> > I think M8 is due at the end of October if we're sticking to 3-monthly
>> >> > milestones.
>> >> >
>> >> > Shall we freeze next Monday with a view to declaring M8 next Friday
>> >> > (31st)?  Is this going to cause problems for anyone involved in active
>> >> > development?
>> >>
>> >> Sounds good to me.  Hopefully we can get M8 out in time for ApacheConUS.
>> >>
>> >> Regards,
>> >> Tim
>> >>
>> >
>>
>>
>>
>>  --
>> Unless stated otherwise above:
>> IBM United Kingdom Limited - Registered in England and Wales with number
>> 741598.
>> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU
>>
>



-- 
Unless stated otherwise above:
IBM United Kingdom Limited - Registered in England and Wales with number 741598.
Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU

Re: [milestone8] Time for M8?

Posted by chunrong lai <ch...@gmail.com>.
  +1.
  I have not development plan in hand.
  But I want to check some issues, include those from ehwa-api and
concurrent tests.
  I also think that some JIRA patches can be reviewed and committed before
M8.

   Thanks.



On Wed, Oct 22, 2008 at 5:58 PM, Sian January <si...@googlemail.com>wrote:

> Oops - I'll see if I can update that today...
>
> 2008/10/22 Jack Cai <gr...@gmail.com>:
>  > Thanks Sian!
> >
> > Guess we need to update our home page News part to add M7 there... It
> still
> > says M6 as the latest stable build.
> >
> > -Jack
> >
> > 2008/10/21 Tim Ellison <t....@gmail.com>
> >
> >> Sian January wrote:
> >> > I think M8 is due at the end of October if we're sticking to 3-monthly
> >> > milestones.
> >> >
> >> > Shall we freeze next Monday with a view to declaring M8 next Friday
> >> > (31st)?  Is this going to cause problems for anyone involved in active
> >> > development?
> >>
> >> Sounds good to me.  Hopefully we can get M8 out in time for ApacheConUS.
> >>
> >> Regards,
> >> Tim
> >>
> >
>
>
>
>  --
> Unless stated otherwise above:
> IBM United Kingdom Limited - Registered in England and Wales with number
> 741598.
> Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU
>

Re: [milestone8] Time for M8?

Posted by Sian January <si...@googlemail.com>.
Oops - I'll see if I can update that today...

2008/10/22 Jack Cai <gr...@gmail.com>:
> Thanks Sian!
>
> Guess we need to update our home page News part to add M7 there... It still
> says M6 as the latest stable build.
>
> -Jack
>
> 2008/10/21 Tim Ellison <t....@gmail.com>
>
>> Sian January wrote:
>> > I think M8 is due at the end of October if we're sticking to 3-monthly
>> > milestones.
>> >
>> > Shall we freeze next Monday with a view to declaring M8 next Friday
>> > (31st)?  Is this going to cause problems for anyone involved in active
>> > development?
>>
>> Sounds good to me.  Hopefully we can get M8 out in time for ApacheConUS.
>>
>> Regards,
>> Tim
>>
>



-- 
Unless stated otherwise above:
IBM United Kingdom Limited - Registered in England and Wales with number 741598.
Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU

Re: [milestone8] Time for M8?

Posted by Jack Cai <gr...@gmail.com>.
Thanks Sian!

Guess we need to update our home page News part to add M7 there... It still
says M6 as the latest stable build.

-Jack

2008/10/21 Tim Ellison <t....@gmail.com>

> Sian January wrote:
> > I think M8 is due at the end of October if we're sticking to 3-monthly
> > milestones.
> >
> > Shall we freeze next Monday with a view to declaring M8 next Friday
> > (31st)?  Is this going to cause problems for anyone involved in active
> > development?
>
> Sounds good to me.  Hopefully we can get M8 out in time for ApacheConUS.
>
> Regards,
> Tim
>

Re: [milestone8] Time for M8?

Posted by Tim Ellison <t....@gmail.com>.
Sian January wrote:
> I think M8 is due at the end of October if we're sticking to 3-monthly
> milestones.
> 
> Shall we freeze next Monday with a view to declaring M8 next Friday
> (31st)?  Is this going to cause problems for anyone involved in active
> development?

Sounds good to me.  Hopefully we can get M8 out in time for ApacheConUS.

Regards,
Tim