You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Jean-Marc Spaggiari (JIRA)" <ji...@apache.org> on 2013/12/18 19:22:07 UTC
[jira] [Created] (HBASE-10199) Improve rolling restart latency
Jean-Marc Spaggiari created HBASE-10199:
-------------------------------------------
Summary: Improve rolling restart latency
Key: HBASE-10199
URL: https://issues.apache.org/jira/browse/HBASE-10199
Project: HBase
Issue Type: Improvement
Components: scripts
Affects Versions: 0.94.14, 0.98.1, 0.99.0, 0.96.1.1
Reporter: Jean-Marc Spaggiari
Assignee: Jean-Marc Spaggiari
HBASE-10049 introduced a 20 seconds delay in the region_mover script to make sure server is online before starting the transfer. On big cluster, this can add more than 1 hour to the total time. We need to find a way to make 100% sure the server is online without having to wait for those 20 seconds.
--
This message was sent by Atlassian JIRA
(v6.1.4#6159)